CI-2009 EAp2:Minimum energy performanceposted by Aline Luther on
I would like to know if there is any Brazilian Standard that can substitute the ANSI / ASHRAE / IESNA Standard 90.1-2007.
Brazilian Equivalent Standard
CS-2009 EAp2:Minimum energy performanceposted by Pamela Svetllana Santos Souza on
Hello, I'm modelling for LEED C&S 2009. The project has 26 floor type of mixed-use offices.
Demolition records lost
NC-2009 MRc2:Construction waste managementposted by Lara Branco on
Hello, I'm working on a project that has lots of demolition phases, because it depends on the expropriation of several buildings. The first demolition occurred in 2011, when the project wasn't yet
ieqc8.1 x ieqc 8.2
NC-2009 IEQc8.2:Daylight and views - viewsposted by GISELA FARHAT DE ARAUJO on
to achieve this credit we must have won the ieqc8.1 credit? or credits are independent?
Supermarket in a small neighbourhood
NC-2009 SSc2:Development density and community connectivityposted by Heraldo Muñoz on
Hello, My name is Heraldo and I am certifying a Supemarket under LEED Retail NC 2009 This supermarket is being constructed in a shopping center that is close to a little neighbourhood. We are a
Calculation
NC-v4 EAc7:Green power and carbon offsetsposted by Vitor Tosetto on
Dear All, I have a doubt about calculation of quantity of REC. I believe you can help me. Using the Example 1 (in page 460 of v4) my project will consume 1,98 MWh per year.
Zone Calculation Ds% for VAV System
NC-2009 IEQp1:Minimum indoor air quality performanceposted by Marina Andrade on
I received this question in IEQp1: "The ventilation calculations indicate that the value of the flow rate of air projected under the condition tested (DS) was modeled as 100% level for each of th
Wall Skirting - or - Baseboards
NC-2009 IEQc4.3:Low-emitting materials - flooring systemsposted by Blanca Cespedes on
I have a vinyl baseboard, does it also have to be Floorscore? Thanks,
2 Buildings in the same lot
CS-2009 MPR3:Must use a reasonable site boundaryposted by Guillermo Alonzo on
Hello from Colombia, We have a C&S Project that has two different buildings (Hotel and offices building) in the same boundary.
100% On site Infiltration
NC-2009 SSc6.1:Stormwater design - quantity controlposted by Rodrigo Tonda on
Hello, we are working on a previously developed site with existing imperviousness less than 50% (Option 1, case 1).