Scope of the Pre-requisite in C&S Shopping mall
CS-2009 IEQp1:Minimum IAQ Performanceposted by Alan Viale on
We are working on a new shopping mall. as usually in my country, a anchor store (tenant deparment store) was first developed and constructed and now is operating.
Aeronautical Maintenance Workshop
NC-2009 IEQp1:Minimum IAQ Performanceposted by Gustavo De las Heras Izquierdo on
This is a 70,000 sf Aeronautical Maintenance Workshop in Colombia with the following features: -The space is 6 meters height. -There are interior walls 5 meter height.
ieqc8.1 x ieqc 8.2
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by GISELA FARHAT DE ARAUJO on
to achieve this credit we must have won the ieqc8.1 credit? or credits are independent?
Supermarket in a small neighbourhood
NC-2009 SSc2:Development Density and Community Connectivityposted by Heraldo Muñoz on
Hello, My name is Heraldo and I am certifying a Supemarket under LEED Retail NC 2009 This supermarket is being constructed in a shopping center that is close to a little neighbourhood. We are a
Calculation
NC-v4 EAc7:Green power and carbon offsetsposted by Vitor Tosetto on
Dear All, I have a doubt about calculation of quantity of REC. I believe you can help me. Using the Example 1 (in page 460 of v4) my project will consume 1,98 MWh per year.
Zone Calculation Ds% for VAV System
NC-2009 IEQp1:Minimum IAQ Performanceposted by Marina Andrade on
I received this question in IEQp1: "The ventilation calculations indicate that the value of the flow rate of air projected under the condition tested (DS) was modeled as 100% level for each of th
Wall Skirting - or - Baseboards
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Blanca Cespedes on
I have a vinyl baseboard, does it also have to be Floorscore? Thanks,
2 Buildings in the same lot
CS-2009 MPR3:Must use a reasonable site boundaryposted by Guillermo Alonzo on
Hello from Colombia, We have a C&S Project that has two different buildings (Hotel and offices building) in the same boundary.
Demolition records lost
NC-2009 MRc2:Construction Waste Managementposted by Lara Branco on
Hello, I'm working on a project that has lots of demolition phases, because it depends on the expropriation of several buildings. The first demolition occurred in 2011, when the project wasn't yet
VRF system
NC-2009 EAp3:Fundamental Refrigerant Managementposted by GISELA FARHAT DE ARAUJO on
We are using the vrf system on a project. Should i put as type of equipment Split AC or should i chose the "others" option?