Documentation Option 1
Pilot-Credits IPpc89:Social equity within the communityposted by Carolina Martinez on
Our project finished SEED evaluator parts 1 and 2, the only mail we received from them is a blank mail indicating that the project is approved to move forward to part 3.
Biodigestion process instead of composting
ND-Plan-v4 GIBc16:Solid waste managementposted by LEED Pro Consultant on
We are trying to achieve the GIB - Solid Waste Management.
Full Occupancy Calculations
EBOM-v4 EQp1:Minimum indoor air quality performanceposted by Giovani Bernal on
Our project is a 24 level office building. At least 75% of occupancy has been reached.
Gross floor area modification
CS-2009 PIf2:Project Summary Detailsposted by Silvia Ruiz on
Hi If a project size is modified (the gross floor area) after the preliminary review, besides of the credits that have been attempted what other consequences do I have to consider? Thanks
Individual Thermal Comfort Controls - Open office
CI-v4 EQc5:Thermal comfortposted by Mariana del Valle on
Hi!
Performance period table
posted by Gustavo De las Heras Izquierdo on
Hallo,
We've been asked by the reviewer to complete and submit the following table: https://www.usgbc.org/resources/performance-periods-table-v2009
Water usage for car wash
NC-v4 WEp2:Indoor water use reductionposted by Gaston Michaud on
Hi Everyone,
CONCRETE WASHOUT STATION-WATER REUSE
NC-2009 SSp1:Construction activity pollution preventionposted by ISOLDA SALINAS on
Hello Everyone,
Percent of Occupants with access to the fixture.
CS-2009 WEp1:Water use reductionposted by Guillermo Hernandez Espinoza on
Hello everyone.
I'm a bit confused with the Percent of Occupants calculation on the Water Use Reduction Calculator.