Forum quick links
Gross floor area modification
CS-2009 PIf2:Project Summary Detailsposted by Silvia Ruiz on
Hi If a project size is modified (the gross floor area) after the preliminary review, besides of the credits that have been attempted what other consequences do I have to consider? Thanks
Individual Thermal Comfort Controls - Open office
CI-v4 EQc5:Thermal comfortposted by Mariana del Valle on
Hi!
Surface Reflectance Furnishings scope
CI-v4 EQc6:Interior lightingposted by Mariana del Valle on
Hi,
Performance period table
posted by Gustavo De las Heras Izquierdo on
Hallo,
We've been asked by the reviewer to complete and submit the following table: https://www.usgbc.org/resources/performance-periods-table-v2009
Water usage for car wash
NC-v4 WEp2:Indoor water use reductionposted by Gaston Michaud on
Hi Everyone,
CONCRETE WASHOUT STATION-WATER REUSE
NC-2009 SSp1:Construction Activity Pollution Preventionposted by ISOLDA SALINAS on
Hello Everyone,
Percent of Occupants with access to the fixture.
CS-2009 WEp1:Water Use Reductionposted by Guillermo Hernandez Espinoza on
Hello everyone.
I'm a bit confused with the Percent of Occupants calculation on the Water Use Reduction Calculator.
Compliance In Scope
CS-2009 PIf4:Schedule and Overview Documentsposted by Guillermo Hernandez Espinoza on
Should I include on the TSLA the credits listed on the CS Appendix 4 with compliace "In Scope" or only those ones in which I selected compliance through "Tenant sales and/or lease agreeme
Enhanced IAQ Strategies, applicable Entries Querie.
CI-v4 EQc1:Enhanced indoor air quality strategiesposted by Angel Giovani Bernal on
Hi everybody.
I'm working on a commercial interiors project located on the 9th, 12th, 14th & 15th floor.