Forum quick links
CS project without bathrooms and elegible fixtures
CS-2009 WEp1:Water Use Reductionposted by Maria Isabel Conde on
We´re working in a CS building without plumbing fixtures. How we can document the WEp1?. We need to make the Tenant Lease agreement?, How we can earn points in WEc3?.
Alternative Transportation: Alternative refueling stations 3%
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Rezkar Abdulmajeed on
I am working on the first LEED project in campus. There is zero parking provided within the LEED project boundary staff.
Balancing Devices to meet ASHRAE 90.1 Mandatory Requirements
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Jorge Torres-Coto on
We have a project that is an industrial facility, it shares the CHW distribution piping between the comfort system and the process system. We are informing the CxTeam that it is required to have b
SSc2 Development Density and Community Connectivity
NC-2009 SSc2:Development Density and Community Connectivityposted by Greg Snow on
My project is located in a hospital campus and I am targeting this credit for 5 points; 3 for community connectivity and 2 for development density.
NC-2009 SSc2: Development Density and Community Connectivity
NC-2009 SSc2:Development Density and Community Connectivityposted by Bouygues Sustainability on
Hi everyone, We are certifying a Hotel. I want to know if we can count in this credit Option 2 the services offered by the hotel. Txs
Shared building electricity meter
EBOM-v4 EAp2:Minimum energy performanceposted by LEED Pro Consultant on
We have a building which shares electricity meter with an adjacent building, only one building will be intended for certification, it is possible to identify the percentage of consumption in every
Reactivating construction with ESC Plan, no ESC Plan before
NC-2009 SSp1:Construction Activity Pollution Preventionposted by LEED Pro Consultant on
Hello! We have a project that started construction some time ago, and stopped 1 yr ago, leaving only the foundation. At this time, they were not considering LEED as an objective.
Unconditioned vs conditioned space
NC-2009 EAp2:Minimum Energy Performanceposted by Gaston Michaud on
Hello everyone, I know this topic has been addressed in several threads below, but I just want to try to have a better understanding of the subject. A conditioned space would be a space with a cool
Waste classified
NC-2009 MRc2:Construction Waste Managementposted by Alicia Villanueva on
Construction waste will be separated onsite. It will be hauled (altogether in the same truck) to centers where workers clasify the waste and sell it to companys which take it to recycling plants.
FSC MIX
NC-2009 MRc7:Certified Woodposted by jorge calderon on
Hello! I´m documenting a floor that is FSC MIX, does it means that I can count it as 100%? I´m not sure because the label only says MIX, not FSC Mixed Credit, neither FSC Mixed (NN)%. Thanks in