delivery entrance in a shopping mall

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Agnieszka Rylska  on 

We are working on a project of a shopping mall. The building has a few delivery entrances (on the ground level and underground level) next to the delivery docks.

2
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Fri Sep 9, 2016, 9:29 am

Hose bibs - permanent irrigation

CS-2009 WEc1:Water Efficient Landscaping
posted by  Petra Hajná  on 

Hi LEEDers. I tried to pursue the credit via calculation because the roject will use the hose bibs on regular basis for the building lifetime, not as a temporary solution.

2
ESG consultant, LEED AP BD+C
Self Employed
LEEDuser Basic Member
36 thumbs up
Tue Aug 2, 2016, 11:19 am

Recycled content in road underlay material

NC-2009 MRc4:Recycled Content
posted by  Agnieszka Rylska  on 

In our project coal slate which is a waste from a coal mine will be used to create the underlay for the roads and the building. Can this be included in recycled content calculations?

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Mon Aug 1, 2016, 10:29 am

CxA contract

CS-2009 EAc3:Enhanced Commissioning
posted by  Agnieszka Rylska  on 

Can Commissioning Authority be contracted through the design firm (architects) as part of the LEED certification contract (CxA would be an employee of the LEED consultant company) and not by the ow

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Wed Jul 27, 2016, 2:35 am

dedicated exhaust

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Agnieszka Rylska  on 

I would like to make sure what does "dedicated/designated exhaust" mean.

5
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Mon Jul 25, 2016, 8:14 pm

ASHRAE requirements for dry-coolers

CS-2009 EAp2:Minimum Energy Performance
posted by  Agnieszka Rylska  on 

Cooling system in our project (shopping mall) consists of dry-coolers sprayed with water. What are ASHRAE efficiency requirements for dry-coolers?

7
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Jul 4, 2016, 7:38 am

Service Hot Water & Heat recovery condensers

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Greetings, In the project we are modeling, the Proposed design has applied a chiller’s condenser heat recovery without this to be required by the prescriptive requirement (6.5.6.2).

11
Thu Jun 9, 2016, 3:26 pm

Previously developed floodplain

NC-2009 SSc1:Site Selection
posted by  Anna Korinkova  on 

We have an office building project, which (according to the local planning codes) lies within a floodplain zone.

2
Wed May 25, 2016, 7:09 am

Exhaust system tests

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Agnieszka Rylska  on 

I have two questions regarding exhaust system tests: 1. Do the tests have to be conducted only for local exhaust fans (like e.g.

7
Sr. Sustainability Project Manager
CodeGreen Solutions
LEEDuser Basic Member
25 thumbs up
Tue May 24, 2016, 8:30 pm

Cooling plant modeling

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

In the project we are modeling the cooling plant which serves the production area and the buildings' HVAC systems is one and the same.

5
Fri Apr 29, 2016, 2:18 pm