Forum quick links
New York State Green Energy...
NC-2009 EAc6:Green powerposted by Rick Alfandre on
New York's Renewable Portfolio Standard states that as of 2013, 23% of the State's electricity came from renewable energy resources.
Group Certification and Showers
posted by FABIO VIERO on
Hi, our project is based on three buildings (A, B and C), with a common basement, dedicated to circulation and parking. We pursue a group certification. Showers and changing rooms are located in
No "official" bus stops
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Neil Rosen on
I'm working on a project that is served by multiple bus lines that do no have traditional bus stops...according to the official schedule the program works on "Hail-a-Bus - Every corner is a bus sto
1-year and 2-year 24-hour Design Storm
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Liubov Melnikova on
Michael DeVuono, I've digged through both forum 6.1 and 6.2 but didn't found international data for Design Storm. I am doing a project in Russia.
Lighting controls
NC-2009 EAc1:Optimize Energy Performanceposted by Isabel Santos on
Dear all, I am trying to model the use of two daylight controls in an industrial storage building with few windows and skylights with only 20% of transmittance.
Stall count: Vehicles vs. Mopeds
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Keith Steurer on
For a project at a University, we are providing 102 parking spaces for cars and 50 spaces for mopeds.
Commissioning stand-by energy sources
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Maya Karkour on
Dear All, Do stand-by electricity generators need to be commissioned as part of this prerequisite?
CO2 sensors located in the return duct
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Katie Raymond on
I noticed Ben's comment below from February 10th, "Also, if the CO2 sensors are located in the return duct, the review team will likely request justification for how those sensors are accurately a
Dormitory / Mixed Use Project
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Cassandra Coffin on
I am working on a new residence hall for a University in which the lower two floors consist of offices, a large multi-purpose room, a seminar room, a learning commons center, a cafe and custodial/m
Building Area vs Space-by-Space method
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Brian Coldwell on
We are working on a LEED-CI project in a large commercial office building, where the overall 'building area' method would clearly be office at 1 W/sf.