LEED v4 Waste Monitoring unit of measurement in Truck Load
CS-v4 MRc5:Construction and demolition waste managementposted by Ronnel Flores on
Our project's waste quantity was recorded in truck load not in kilograms. This counts as volume?
Waste Manangement
Warehouses-NC-v4.1 MRc5:Construction and Demolition Waste Managementposted by Joseph Snider on
Working on warehouses in areas that do not have many options for recycling. Just to be clear, can you do just the waste reduction option of <10 lbs/SF and if so, that is all you put in the
Gather one year waste data or do a waste analysis/audit?
EBOM-v4.1 MRp3:Waste Performanceposted by shashank gangil on
Dear,
Changing structural systems between the baseline and proposed design
NC-v4 MRc1:Building life-cycle impact reductionposted by Ahmed Abd El Fattah on
Hello
Is changing from concrete structure to steel structure accepted in LCA?
Education Programs required to be about the LEED building
NC-2009 IDc1:Innovation in Designposted by Lawrence Lile on
You can have a wonderful environmental education program, but if it doesn't talk about the LEED building, it will get rejected.
Can ground level landscape be classified as Nonroof Measures?
NC-v4.1 SSc5:Heat Island Reductionposted by Antonio Poblete on
Do areas with ground level landscape count towards any of the calculations?
Thoughts on Single Package Vertical Unit with Integrated ERV
posted by Amanda Spice on
Hi All!
MRc2 BPDO EPD Option 2 Multi Attribute Optimization
NC-v4.1 MRc2:Environmental Product Declarationsposted by Sarah Linke on
Has anyone had success pursuing credit for the BPDO EPD Option 2 (Multi Attribute Optimization)? The companies I have had success finding documentation for are as follows:
Path 3: Proposed building values exceeding 5% in one category.
CI-v4.1 MRc2:Interiors Life-Cycle Impact Reductionposted by Gaston Michaud on
Hi everyone,
Ventilation in corridors
NC-v4 EQp1:Minimum indoor air quality performanceposted by Luana Jerez on
We are working on an office building 17 meters wide, on one floor, the layout is a 3.5-meter distribution corridor, serving as a division between two rows of offices.