Forum quick links
Required Signatory SSc5.2-1. Owner/Agent
NC-2009 SSc5.2:Site development - maximize open spaceposted by Aldo Pazo on
Hello everyone!! Could anyone explain what's required in point Upload SSc5.2-RS1?
DES -option2: virtual rate
CS-2009 EAp2:Minimum energy performanceposted by Johannes Gellrich on
Modeling a DES system after Option 2, we got the energy consumption and prices from the DES.
outdoor air rate for kitchens
CI-2009 IEQp1:Minimum indoor air quality performanceposted by Adam Targowski on
I would like to ask if there's any requirement regarding outdoor air suplly to a kitchen located in an office area? In ASHRAE 62.1-2007 Table 6-1 a kitchen is not mentioned.
SHGC vs U-factor
CS-2009 EAc1:Optimize energy performanceposted by Alex AC on
Hi everybody! I´m looking at several glass options for a building project and I want to make sure I pick the most cost-effective and energy efficient options available to me.
LEED paperwork for EAp2: Seciton 1.2 - Space Summary
NC-2009 EAp2:Minimum energy performanceposted by Doug Cooper on
Does the LEED online form want me to list each space room by room, or are a few overall general space types okay?
Ceiling credit
CI-2009 IDc1:Innovation in designposted by Tarek on
now we are working on project Commercial interior in Egypt ,As you know that there is no credit related to ceiling , 80% of building was used the false ceiling and this ceiling was Meets CA Dept.
CX EBOM EAc2.1
EBOM-2009 EAc2.1:Existing building commissioning - investigation and analysisposted by Katherine Phelps on
Looking for a Building commissioning service provider in Southern Massachusetts.
Contract service use of equipment
EBOM-2009 SSc2:Building exterior and hardscape management planposted by Kay Sieck on
Do I need to get a list of the powered equipment used by our contract service that is used on site for landscape management such as lawn mowers and leaf blowers?
Building recessed into hill/mountain
NC-2009 EAc1:Optimize energy performanceposted by Anoop Vijay on
Hi, I have a query related to baseline modeling for a hotel project in oman. This hotel is built on a hillside with the building recessed into the hill completely on one side.
SS3, No LEED approved pesticides available here
EBOM-2009 SSc3:Integrated pest management, erosion control, and landscape management planposted by Ruba Al-Foraih on
I am working on certifying an existing building in a country where non the pesticides approved by LEED are available.