Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Optimize building product BD+C and CS

LEED v5 BD+C/ID+C: Materials and Resources Public Comments
posted by  Chantal Carius  on 
  • It is not clear how many products the project team will need for the option 1 or the option 2, the same table that ID+C has should be shown in this part.
  • The credit's requirements
0

Construction and Demolition Waste Reduction

LEED v5 BD+C/ID+C: Materials and Resources Public Comments
posted by  Chantal Carius  on 

This credit should be attempting zero waste management in construction.

0

Minimized Site Disturbance

LEED v5 BD+C/ID+C: Sustainable Sites Public Comments
posted by  Chantal Carius  on 

This prerequisite is a great goal to achieve.

0

The Thermal Environment Credit Category Needs Attention

LEED v5 BD+C/ID+C: Indoor Environmental Quality Public Comments
posted by  Chris Mackey  on 

I’m glad to see that the new standard includes a reference to a specific known problem of thermal comfort (overcooling) and the ASHRAE-55 section on it but I am overall very disappointed that there

0

Sound Environment and Occupant Experience

LEED v5 BD+C/ID+C: Indoor Environmental Quality Public Comments
posted by  Projetos Giner  on 

The LEED mission, as stated in the Strategic Plan, is to ensure that buildings create spaces that promote human and environmental well-being, including designing healthier and safer environments fo

2
Sat May 18, 2024, 7:34 pm

Arbitrage option

CS-v4 EAc5:Renewable energy production
posted by  Glen Boldt  on 

When using the "arbitrage" option, is there a limit regarding where, geographically, the replacement RECs can be purchased form?

1
Fri May 17, 2024, 11:35 pm

Emmissions factor sources should be specified

LEED v5 BD+C/ID+C: Integrative Process, Planning, And Assessments Public Comments
posted by  Caroline Quinn  on 

Recommend that in accordance with GHG Protocol emissions factors should be sourced from the EPA used for non-electricity energy sources.

0

LEED v5: O+M - Public Comments

LEED v5 O&M Existing Buildings Public Comments
posted by  Kelly Mehring  on 

Integrative Process, Planning & Assessments

Credit: Operational Planning and Response for Resilience

0

Social Equity Assessment: Would be good to reference the Building EJ Toolkit as a resource for the social

LEED v5 BD+C/ID+C: Integrative Process, Planning, And Assessments Public Comments
posted by  simon fowell  on 

I would recommend referencing the Building EJ Tool (https://www.ejtoolkit.com/) in this credit as a tool for project teams to more-easily complete the checklist / Social Assessment.

0

Regional Materials

LEED v5 BD+C/ID+C: Materials and Resources Public Comments
posted by  Sarah B Gregg  on 

Consider adding an option to reward the use of locally sourced materials.

0