Forum quick links
CI Project in two buildings
posted by Steve Khouw on
Need guidance, not sure whether we have to register as 1 project or 2 here. We have a project whereby the tenancy space involves 1 building of 8 floors and the adjacent building of 3 floors.
Prescriptive Method: Skylights
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Kash Boodjeh on
Hello, We are pursuing the Prescriptive Method for this credit, using skylights.
a mistake in the daylight formula of the available spreadsheet
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Eddy Santosa on
Please be careful and aware when you use the available spreadsheet: Daylight and Views Calculator released 11152010.xls .
Demand Limiting Controls
CS-2009 EAc1:Optimize Energy Performanceposted by Rodrigo Perez on
Hi, For the energy evaluation of EAP2 and EAC1, "demand limiting control" is accepted how energy saving strategies in the proposed model? In this case, how would be the simulation for the ba
PIf1
posted by Andrew Gil on
Has anyone wrestled with the fact that LOv3 PIf1 reads like it is intended ONLY for all-new projects?
Product extraction
NC-2009 MRc5:Regional Materialsposted by Dario Ibarguengoitia on
Hello, I have a LEED project in mexico city and we are using steel to document this credit. However the extraction is in Japan and it is manufacturated within 500 miles.
NPD Prerequisite 3 - Connected and Open Community
posted by Cesar Ruiz on
Hi all, Regarding NPD P3, Is it necessary for achieving this prerequisite to include the green open space area into the net area used to calculate the intersections per sp.
Green Globes
posted by Chris VanderWeyden on
Considering that in 2008 Jones Lang LaSalle acquired ECD ENERGY AND ENVIRONMENT CANADA LTD, who developed Green Globes. ...