Forum quick links
campus energy plant
CS-2009 EAp2:Minimum Energy Performanceposted by charles bell on
Our LEED review of EAp2 seems to indicate that we cannot model the central plant and have to use “purchased chilled water” for both the baseline and proposed.
Existing Roads as Recycled Content
ND-v2009 GIBc15:Recycled content in infrastructureposted by Colin Day on
If a new ND project is using the hardscape infrastructure of a previous housing development plan that was shelved/foreclosed, does that existing infrastructure count towards the percnetage of recyc
LEED EBOM for a Factory
posted by dia2000@gmail.com dia2000@gmail.com on
My client is a manufacturing facility of Electrical Cables located outside the US. The factory was built in 2010 and stated operations since then.
different irrigation system between landscape and green roof
NC-2009 WEc1:Water Efficient Landscapingposted by Adi Negara, LEED AP BD+C on
Hi, If we have a project that will have landscape and a green roof which will have different irrigation system whereas no permanent irrigation system will be installed on the landscape and the ins
Geothermal well field and SSc5.2
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Cynthia Estrada on
Our project is a LEED NC-2009 addition to a college which will include geothermal. If the well field once placed is returned to near its original state via indiginous plantings, etc.
Chiller Selection for Baseline
NC-2009 EAc1:Optimize Energy Performanceposted by Poorva Keskar on
We are working on a project where the total project has five towers on one podium. We are certifying only one tower for LEED-NC with an area of 34152 sq.m.
Chemical storage room with recirculating HVAC cooling system
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Maya Karkour on
Hello, One of the LEED requirements of this credit is: "[For rooms with chemicals / hazardous gases], the exhaust rate must be at least 0.50 CFM per sq. ft.
Warning for net-zero projects.
NC-2009 EAc6:Green powerposted by Hernando Miranda on
The GBCI has decided that net-zero projects must buy additional EAc6 green power if the actual energy use for two-years post-occupancy does not match the GBCI approved results from EAc1/EAc2.
Green Roof over an underground parking garage
NC-2009 SSc7.2:Heat Island Effect—Roofposted by adi ashkenazi on
Can I calculate the green roofs over an underground parking garage? (I calculated them as part of the landscape for SS CR 7.1-non roof) Thanks
Online documentation clarification
NC-2009 SSc1:Site Selectionposted by BABAR MEHMOOD on
As i checked online submittal template, it seems that we only have to mark the check box, do we have to need to submitt any documentation for the requirements mentioned in this credit.