Forum quick links
Combine options
NC-2009 IEQc3.2:Construction IAQ management plan - before occupancyposted by Leandro Silva on
We are certifying a Project and we are preparing the documentation for the EQ credit 3.2 Construction Indoor Air Quality Management Plan – Before Occupancy.
Corrective Actions and Sub-metering
CS-2009 EAc5.2:Measurement and verification - tenant submeteringposted by Jatuwat Varodompun on
For the submetering, we can just provide the box that allow the tenant to install the meter, right?
Existing building reconstruction and expansion
NC-2009 EAp2:Minimum energy performanceposted by Deborah Lucking on
Questions for the experts: We have a project that will have some floor areas demolished and reconstructed/renovated, and also some new construction (less than 20%). 1.
Functional, usable spaces
NC-2009 SSc7.2:Heat island effect - roofposted by Jeannie Rueter on
What is the definition of "functional, usable spaces"?
Planned/future Photovolatic installation
NC-2009 EAc2:On-site renewable energyposted by Stacey Olson on
I'm working on a project that has installed the infrastructure to support a PV array, and is pursuing Enhanced Commissioning.
Terms and concepts used in the form
NC-2009 SSc6.1:Stormwater design - quantity controlposted by Gabriela Mesquita on
Good morning, We are working in a Project in Asunción, Paraguay.
Multiple types of MERV filters for pressure drop adjustment
NC-2009 EAp2:Minimum energy performanceposted by Ricardo Sá on
Hi, I have several AHU's that serve a big office building.
Baseline HVAC system modeling
NC-2009 EAp2:Minimum energy performanceposted by Ricardo Sá on
Hi, I have a 14 story office building (6 below ground and 8 above).
Intelligent Glazing
NC-2009 IEQc8.1:Daylight and views - daylightposted by Peter Sushch on
For the majority of our project we are using intelligent, electrochromic windows that automatically tint to maximize natural light.
Signage Language
EBOM-v4 EQp2:Environmental Tobacco Smoke Controlposted by Julia Perez on
I would like to know if there are any specific requirements on the type of signage that should be put up.