Forum quick links
Industrial buildings: EAc1 Optimize Energy Performance
CS-2009 EAc1:Optimize Energy Performanceposted by Jane Long on
Hi, I’m working on a pre-assessment for a large manufacturing (aircraft) plant.
Modeling OA for naturally ventilated space
NC-2009 EAc1:Optimize Energy Performanceposted by Orlin Velinov, PE on
We have a project that is a parking garage structure.
Energy Modeling: Dome (Design) vs. Dome (Baseline)?
NC-2009 EAc1:Optimize Energy Performanceposted by Nelina Loiselle on
I am working on the LEED Certification of a 23,000sq.ft. concrete "business continuity" dome. It is literally a concrete dome.
SLL Credit 3 Reduced Auto Dependence
posted by Peter Doo on
Requirements emphasize "existing" transit service. I assume that new transit service is negotiated as part of the project plan will also count. Please confirm.
green power for residential hi-rise
NC-2009 EAc6:Green powerposted by Lorey Flick on
How can this credit be achieved if the building is a high-rise residential building where all apartments are separately metered? This is a rental building.
Tenant spaces simulation without HVAC
CS-2009 EAc1:Optimize Energy Performanceposted by victor mattos on
Does anyone knows if the tenant spaces shall be simulated with HVAC system for a shopping mall or can i just simulate with idealloads? I searched in the LEED Reference guide Appendix 2 but it does
Seawater flushing
CI-2009 WEc1:Water Use Reductionposted by Edwin Wealend on
Hi Does anyone know if sea water flushing which is non-potable water can contribute towards these credits. We are working on new LEED-CI project in Hong Kong that uses sea water for flushing conne
Warehouse Flush Out
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Curt Pascoe on
Both NCv2.2 and v2009 are clear with the temperate and humidity constraints.
temporary use of hvac during construction
Schools-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Keelan Kaiser on
I have another question similar to above. We have a project that is substantially complete with construction, the cleaning crews are in right now. Only flooring remains to be installed.