case 2. Residential and Hospital Projects Only - Requirements

NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Control
posted by  Veronika Sundberg  on 

Hi, I have a question regarding case 2. Residential and Hospital Projects Only. In the requirement for the prerequiset 8 bullets are listed that needs to be met.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Sep 19, 2011, 9:12 am

Energy Bills are the Entire Site and Not Broken Down by Building

EBOM-2009 EAp2:Minimum Energy Efficiency Performance
posted by  Cynthia Fowler  on 

My project building is one of 40+ on a company's campus/site. They do not purchase electricity on a building-by-building basis, but for the entire site.

4
Fri Sep 16, 2011, 7:30 pm
4
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Fri Sep 16, 2011, 11:50 am

MR Credit - Environmentally Preferable Structure and Enclosure

General forums
posted by  Keith Lindemulder  on 

First - PLEASE bring back some kind of number system like MR4, MR5, whatever...these credit names are too difficult to remember and differentiate.

3
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Thu Sep 15, 2011, 7:35 pm

Looking for an example

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Eamon Geary  on 

In the course of the 30+ LEED projects I have participated in, I have never successfully achieved this credit.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Thu Sep 15, 2011, 4:17 pm

Transient Occupants (specifically students)

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Ashley Chiang  on 

I understand the different occupancy types and the default fixture use values; however, what I do not understand is how I am suppose to get a somewhat accurate estimation of a occupancy daily total

2
Sustainability Professional
LEEDuser Expert
430 thumbs up
Thu Sep 15, 2011, 4:02 pm

Poured concrete is not an air

General forums
posted by  Susan Walter  on 

Poured concrete is not an air barriers. Your wall section will need a separate air barrier.

2
Thu Sep 15, 2011, 2:44 pm

Consensus process

General forums
posted by  Bill Swanson  on 

"Consensus decision-making is a group decision making process that seeks not only the agreement of most participants but also the resolution or mitigation of minority objections" If LEED is update

4
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Thu Sep 15, 2011, 1:17 pm

Recycled Content/Certified Wood

CI-2009 MRc4:Recycled Content
posted by  Méabh Browne  on 

Hi, I'm working on LEED CI project, which has used products such as panels which are made of steel (20%) which has reycled content (50%) and particle board (80%) which is FSC certified(100%).

4
Thu Sep 15, 2011, 8:29 am

Hi
The credit defines comfort

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  SUNG SU KIM  on 

Hi The credit defines comfort according to the four primary comfort criteria identified by ASHRAE 55-2004: air temperature radiant temperature humidity air speed. A comfort control meeting the c

2
Thu Sep 15, 2011, 6:45 am