Creme Marfil Marble

CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Colleen Ice  on 

I see a lot of threads based on hard surface materials being exempt, but what about marble.

2
Tue Sep 27, 2011, 6:13 pm

Expected volume of recycling

CI-2009 MRp1:Storage and Collection of Recyclables
posted by  Nina Tallering  on 

How do I calculate the 'expected volume of recycling'? I realize this is a redundant post/question, however, we continue to receive GBCI preliminary review comments that request the expected volum

2
Sustainable Project Manager
KEMA Services
LEEDuser Basic Member
28 thumbs up
Tue Sep 27, 2011, 5:23 pm

landfill has a recycle/reuses program in place

NC-2009 MRc2:Construction Waste Management
posted by  ming zeng  on 

We have a project that the local landfill has a recycle/reuse program. For example, they will chip out wood and reuse it as road bed materials to build the road system in the landfile.

3
Tue Sep 27, 2011, 2:47 pm

Modeling a unique HVAC System

NC-2009 EAp2:Minimum Energy Performance
posted by  matthew strong  on 

We have a campus project that has a unique HVAC system for cooling that reuses return water from a central plant that has already circulated to other campus buildings.

2
Tue Sep 27, 2011, 12:13 pm

NEBB Certification Required?

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Nathan Lee  on 

A question about NEBB Certification. Is the CxA required to have an NEBB certification in order to qualify?

2
Default Avatar
Project Engineer
SGS Korea
LEEDuser Basic Member
36 thumbs up
Tue Sep 27, 2011, 1:58 am
6
Mon Sep 26, 2011, 10:54 pm

Control types in Group Multi-occupant Spaces

EBOM-2009 IEQc2.2:Controllability of Systems—Lighting
posted by  Jenny Carney  on 

All, Word on the street is that there's a new standard teams are being held to for the types of controls that are allowed in group spaces.

3
Principal
Ackerstein Sustainability, LLC
LEEDuser Expert
545 thumbs up
Mon Sep 26, 2011, 7:52 pm

Existing Finish

CI-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elements
posted by  Sara Neff  on 

I looked through the reference guide for a definition of 'finished,' but I couldn't find one, so I'm hoping someone here can help: I have a CI project that is moving into a space that has existing

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Sun Sep 25, 2011, 10:05 am

O&M Manual is the bible

General forums
posted by  Bazeeth Ahamed Khader Mohamed Ali  on 

I have taken the exam in Feb 2011 and passed with 187. There are no short cuts. Get familize with the reference manual. Practice questions from GBES or Ever Blue may help you more

2
Sat Sep 24, 2011, 9:52 am
8
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Sep 23, 2011, 1:23 pm