Parking garage ventilation - Proposed vs. Baseline

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Hi Markus, Following our correspondence as of Jul/13/2017, we've modeled the garage ventilation claiming some energy savings. We've provided explanation reflecting all details including all conside

9
Fri Aug 11, 2017, 1:43 pm

Credit Make-up Air Unit

NC-2009 EAp2:Minimum Energy Performance
posted by  John   on 

Can we claim the credit for Make-up air unit? or do we need to model it in Baseline same as proposed? How to show this system in Section 1.4?

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Aug 11, 2017, 3:38 am

IOc3 from LEED EBOM v2009

EBOM-v4 INc1:Innovation
posted by  Marc Mondor  on 

I am not seeing the LEED v2009 Innovation credit 3: Documenting Sustainable Building Cost Impacts listed under acceptable Innovation credits for v4.

2
Thu Aug 10, 2017, 10:39 pm

District Energy Systems

NC-v4 EAp2:Minimum energy performance
posted by  Bob Crowell  on 

Marcus or anyone who knows the answer, I have a squash facility that is being added on to an existing building. The LEED Boundary does not include the plant. 1) The existing plant serves only one

5
Default Avatar
Vice President / Principal
2rw Consultants, Inc.
LEEDuser Basic Member
1 thumbs up
Thu Aug 10, 2017, 9:42 pm

Stairs from the lobby of the building - even for a CI project?

Pilot-Credits EQpc78:Design for active occupants
posted by  Crista Shopis  on 

If I am working on a CI project where the tenant project space is two floors in a high rise.

3
Sustainability Manager
Burns & McDonnell
LEEDuser Basic Member
24 thumbs up
Thu Aug 10, 2017, 7:47 pm

What qualifies to show energy star label??

EBOM-2009 MRc2:Sustainable Purchasing—Durable Goods
posted by  Jennifer Fitts  on 

We submitted for review and comments came back on our electronics portion of this credit for HP Elitebook 8450p and 2740p machines that do have energy star label.

4
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Wed Aug 9, 2017, 3:59 pm

FTE for university facility

Calculating FTEs
posted by  Nadia Bini  on 

Our project is a University educational facility aiming for LEED-Canada 2009 (v3) certification. LEED stipulates that students are to be considered temporary occupants, however we anticipate that

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Wed Aug 9, 2017, 1:45 pm

LCA Software applicable for Macau, China

NC-v4 MRc1:Building life-cycle impact reduction
posted by  ruffina thilakaratne  on 

is there any LCA software that can be used in Macau, China? Macau is part of PRC (China) administration), but not geographically located within China, closer to Hong Kong.

3
Wed Aug 9, 2017, 9:45 am

2004 Energy Star score applicable?

EBOM-v4 EAp2:Minimum energy performance
posted by  Yulia Chen  on 

Hi all, We intend to apply for a LEED EBOM cert for a multi-tenant building built in the 1910s. The building was renovated and earned its Energy Star Score back in 2004.

3
Architect - Cx Provider - Building Performance Specialist
GLHN Architects & Engineers
LEEDuser Premium Member
25 thumbs up
Wed Aug 9, 2017, 1:05 am

Printers

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Ciaran McCabe  on 

What happens if the printers are situated with the open plan office - not a dedicated room. Does the printer need to be a particular spec ?

2
Mon Aug 7, 2017, 8:27 pm