Forum quick links
Building Frontage
ND-v2009 NPDp1:Walkable streetsposted by Tommy Linstroth on
Our project is a 100% gut rehab of existing attached townhomes.
Continuous sidewalks for industrial use street
ND-v2009 NPDp1:Walkable streetsposted by Noriko Nagazumi on
Hi there! The reference guide says: "Continuous sidewalks or equivalent all-weather provisions for walking are provided along both sides of 90% of streets or frontage within the project, includin
Ratio 1:3
ND-v2009 NPDp1:Walkable streetsposted by Diana Nezamutinova on
Greetings, Eliot! Would you please be so kind to help with 4 questions below?
Breezeway Principal Functional Entry?
ND-v2009 NPDp1:Walkable streetsposted by Tommy Linstroth on
Just hoping for a clarification/second opinion. Our project features 2-3 story walkup apartments that are access by central breezeways.
Parking Garage
ND-v2009 NPDp1:Walkable streetsposted by Susann Geithner on
We have a parking garage attached to an office building. The office building is on a public street, so is the garage. So the building is between two streets.
Frontage Width and Block Length
ND-v2009 NPDp1:Walkable streetsposted by lara Tahhan on
Hello, I would like to inquire about the frontage widths.
Sample site plan
NC-2009 SSc8:Light Pollution Reductionposted by Bill Swanson on
I think it would be good to show a sample submittal with a plan view of the site. Most people seem to think this credit is easy since the calculations they've seen were done wrong.
interior light leak reduction
NC-2009 SSc8:Light Pollution Reductionposted by Elizabeth Frenchman on
Please address this in a paragraph or two.
Harvard's?
NC-2009 SSc8:Light Pollution Reductionposted by John Beeson on
I'm sure you are familiar with Harvard's GreenCampus Resource?
Vertical Footcandles: How High the Measurement
NC-2009 SSc8:Light Pollution Reductionposted by Joshua Radoff on
There has been some conversation here about the concept of vertical footcandles. Across the industry, this seems to be an issue that is not very well understood.