MR Credit Spreadsheet
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Bhavin Pardiwala on
Is there a comprehensive spreadsheet that I can download to document/track all of the information for the MR credits?
Tenants
EBOM-2009 IEQc2.3:Occupant Comfort—Thermal Comfort Monitoringposted by Gustavo De las Heras Izquierdo on
Does anyone know if all the tenants need to be included in this credit?
ENERGY STAR web services through utilities
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Kimberly Hosken on
We have the opportunity to push our utility data to ENERGY STAR from our utility company. There are now about a dozen utilities doing this in the USA.
Baseline System 9 fan details
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, We have zones in our project which are addressed to system 9 (heating only).
credits gained due to implementation hvac load reduction system
NC-2009 IEQc2:Increased Ventilationposted by sam Alfassy on
I am looking to install hvac load reduction system (HLR ), the system functions by recycling the existing indoor AIR and removes CO2 and other indoor air contaminants, resulting in reduction of fre
Volume boundary in CFD calculations
Healthcare-v2009 IEQc5:Indoor chemical and pollutant source controlposted by VICTOR MORENO on
Hi, to perform CFD model for IEQc5-LEED Healthcare. What is the size of the model boundary in exterior CFD calculations? That is to say, What area (m2) around the hospital we have to model?. Than
Active Controls with a Fan Coil Unit System
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Ciaran McCabe on
For a Fan Coil Unit system, with outdoor air being provided adjacent to the rear of the unit will the outdoor fresh air rate (from the main AHU) need to modulate to qualify as "active control" or i
Will Sit/Stand desks become standard?
Pilot-Credits EQpc44:Ergonomics approach for computer usersposted by Ron Finney on
Have your clients begun asking for this to become their new standard? I haven't seen this yet but we are starting to use them more and more. frequently.
Metal ceiling tile compliance
Healthcare-v2009 IEQc4:Low-emitting materialsposted by Mark Meaders on
We are looking to use metal ceiling tiles with powder coated paint that is painted at the factory. Are such tiles required to comply with CDPH/EHLB Standard Method v1.1?
RE: Vanpool Parking for a Core and Shell
CS-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Troy Glasner on
Hello, I am working on a C&S project. The minimum parking capacity set by local zoning is 165 parking spots. The project has 165 spots exactly. The project size is 86000 sq ft.