Forum quick links
LEED v 4 deadline
posted by Tobias Berge on
We are planning to register a LEED v 4 Core & Shell project on LEED Online.
FTE for campus or for building
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Karen Elliott on
We have a manufacturing campus and are assessing a new office block within that campus.
FTE for campus or for building
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Karen Elliott on
We have a manufacturing campus and are assessing a new office block within that campus.
FTE for campus or for building
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Karen Elliott on
We have a manufacturing campus and are assessing a new office block within that campus.
FTE of unoccupied gutted adjacent tenant
posted by Andrew Bennett on
under case 2 option 1 this space would not add any FTE to the building total right? v3 Commercial Interiors
Building Footprint
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Alejandro Macias on
For the calculation of the building footprint, if the project is located in a Previously developed area .Which area of the building footprint should I use?
Surrounding Density - Previously Developed Site
NC-v4 LTc4:Surrounding density and diverse usesposted by Dana Waters on
In the Required Documentation section of the Reference Guide, it states that a project must provide a "description of the previous development on the site." How does USGBC define the "site" in thi
Deck over parking; do I have this right?
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Susan Di Giulio on
Our project has multiple levels of parking under a large podium plaza. I believe this is what what the Reference Guide (p 112) refers to as a "deck", right?
Paints or sealants applied before building is sealed
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Patrice McVeigh on
Hi, If paints /sealants /adhesives are being applied on site but before the building has been enclosed do they still need to comply with the associated VOC limits?
CHP Modeling
NC-2009 EAc1:Optimize Energy Performanceposted by SAMY Chamy on
Dear Marcus..... Greetings... In one of our project , we have CHP which fall under Case 1 as given in LEED Guide, CHP under Same Ownership..We have 2 nos of 500 KW Gas Generator which supplies