Forum quick links
No irrigation for pre-req
NC-v4 WEp1:Outdoor water use reductionposted by Robyn Dowsey on
I have two turf areas that will not be irrigated after establishment My understanding is that for the water sense calculator you must model them with irrigation is they are landscaped Is this true
Mixed-use Building
CS-2009 SSc9:Tenant Design and Construction Guidelinesposted by Wan Ji Loo on
Hi, my project is a mix use building with two buildings connected via a commercial area below, a residential and hotel in one block and a office tower in the other.
"Preserve from development activity 40% of the greenfield area"
NC-v4 SSc2:Site development - protect or restore habitatposted by Natalie Otoole on
Our 5 acre site has no greenfield area- we are demolishing the entire site and will restore with some green space/vegetation after construction.
Apparatus bay of Fire Department
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Laura Charlier on
HI there, Would the apparatus bay of a fire department need to be included in the building flush-out? I see a typical garage would not need to be included but this isn't a typical garage.
is a tenant lease agreement applicable here?
CS-2009 IEQc8.1:Daylight and Views—Daylightposted by Alfonzo Collins on
I am working on a C&S office building, and I'm reading differing viewpoints on this credit and IEQc8.2. Must these credits be included in the Tenant Lease agreement?
Conveying systems now accepted for this credit
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Paula Melton on
A recent Interpretation states that fire-suppressing equipment and conveying systems now count toward the who
Conveying systems now accepted for this credit
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Paula Melton on
A recent Interpretation states that fire-suppressing equipment and conveying systems now count toward the who
Conveying systems now accepted for this credit
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Paula Melton on
A recent Interpretation states that fire-suppressing equipment and conveying systems now count toward the who
Location of Co2 sensors
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Stella Stella on
Hi, We have a project where in IEQ C1 was attempted when almost the construction was already completed.
Case 2
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Mike D on
The project has 2500 FTE and occupies more than 75% of the building space. The building has only 5 parking spaces, so cannot meet the 5% required for the carpool/vanpool.