Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Building with different uses

NC-2009 MPR5:Must comply with minimum occupancy rates
posted by  Manuel Broll  on 

Hi there, i am a little bit confused about the egibility of a building. Within the building there is office (60%), retail (30%) and underground parking (10%).

1
Mon Feb 24, 2014, 11:34 pm

BMP Non Compliance and / or Removal of BMP Mid-project.

NC-2009 SSp1:Construction Activity Pollution Prevention
posted by  Richard Palmer  on 

Please could someone advise as the best way to report the removal of a BMP from the ESCP midway through the project?

1
Mon Mar 3, 2014, 8:15 pm

Included Furniture

Schools-2009 IEQc4.5:Low-Emitting Materials—Furniture and Furnishings
posted by  Johannes Gellrich  on 

Hello all, I have problems to determine the necessary extent of furniture: The guide says "Classroom furniture including all Student and teacher desks [...]". Do we only have to implement desks, ta

0

How strictly is the "accessible location" interpreted?

NC-2009 MRp1:Storage and Collection of Recyclables
posted by  Christina Nguyen  on 

We have a 3-story classroom building for a community college.

1
Fri Jul 25, 2014, 4:10 am

ASHRAE Forms in LEED Template v4

CI-2009 EAp2:Minimum Energy Performance
posted by  Sunayana Jain  on 

Hi, The LEED template requires to upload interactive forms of ASHRAE. Also, it says it is optional.

1
Tue Mar 4, 2014, 2:29 pm

Masonry Joint Sealant

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Erin Holdenried  on 

Hello. Would Masonry joint sealant fall in under the "Other" category for a VOC limit of 420 g/L?

1
Fri Mar 7, 2014, 7:56 pm

SSc6.2 form

CS-2009 SSc6.2:Stormwater Design—Quality Control
posted by  wendy zhao  on 

Hello I'm very confused by the calculation methods about the TSS removal efficiency .

1
Thu Feb 20, 2014, 5:16 pm

Stormwater tank

CS-2009 WEc1:Water Efficient Landscaping
posted by  BH .  on 

I have a question regarding the retention tank for the irrigation system.

1
Sat Jul 26, 2014, 3:42 pm

Achieving Green Power in the UK

CS-2009 EAc6:Green Power
posted by  Carine Guenand  on 

Has anyone achieved this credit in the Uk? And do the REC/contract to be in place at the time of handover to the client? The building will not be occupied straight away.

1
Fri Feb 21, 2014, 3:32 pm