Forum quick links
Cold, dark warehouse, round 3 (at least)
CS-2009 MRp1:Storage and Collection of Recyclablesposted by Tiffany Moore on
I just received review comments back on MRp1 that I simply can't validate. I'd appreciate any help or advice that might be out there.
Pool
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Jorge Lopez de Obeso on
If SSc2 is achieved, would a swimming pool count towards credit achievement? I´d think so, however I read other posts and there is a comment that says no... Does anyone have a positive feedback a
temporized faucet
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by LEEDme Lorenzi on
The water use reduction additional guidance says: the flow rate is determined using the flow rate in gallons per minute (gpm) and the duration setting (in seconds) for the metering faucet.
Coconut Fiber
NC-2009 MRc6:Rapidly Renewable Materialsposted by María Fernanda Aguirre on
Hi! Can coconut fiber count as both, recycled content (pre-consumer if coming from coconut sub-products industrial process) and a rapidly renewable material as well?. Thanks
LEED CI Project Boundary - Non-conjoining Spaces
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by Matthew Catterall on
We have a project for a single entity that owns and occupies an entire building. They are required to achieve LEED silver on this renovation per their local code.
CAPP Plan
NC-v4 SSp1:Construction activity pollution preventionposted by UGC/GPRO Office Account on
Hello, Does anyone have a Construction Activity Pollution Prevention plan example? What does it include? Erosion control, light pollution prevention, stormwater management plan
Exterior Radiant Heaters
NC-2009 EAp2:Minimum Energy Performanceposted by Seth Penchansky on
We are considering LEED certification for a four season golf range hitting facility that will have hitting areas with overhead radiant heaters and indoor conditioned areas as well.
Submittals - requirements
Pilot-Credits EQpc78:Design for active occupantsposted by Lily Li on
General:Register / Participate in the LEEDuser pilot credit forum / Survey Credit Specific:Plan & narrative, Participate - have a account or contribute to the discussion?
Compliance with Core Performance Guide Sections
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Ron Dean on
Hello everyone, I'm working in a smal project (just 2 floors) that is naturally ventilated overall.
Possible Exemption?
EBOM-2009 IEQc1.3:IAQ Best Management Practices—Increased Ventilationposted by Alexis Thompson on
Our project building has 5 AHU systems; 4 of them significantly exceed ASHRAE (200%, 130%, 363%, 41%). The building is a laboratory and has very stringent requirements for OA delivery and IAQ.