I am working on a project that has 164 parking spaces. The owner has installed 2 EV charging stations that serve 1 vehicle per day, and they plan to install 7 more EV charging stations in the future "as needed" to meet the 3% threshold.
Do we need to provide a narrative stating when the future stations will be installed, or is a site map noting the location of the charging stations sufficient?
V B
3 thumbs up
January 16, 2014 - 10:32 am
I think our project may be in a similar situation. We would like to meet that requirement, without installing the actual fueling station. We would just like to have the wiring in place and a charging station can be added as required by the tenant (apartment resident). Will this satisfy the credit requirement? Or does the physical station need to be present to meet the requirement?