Update of the ASHRAE Level II Audit report
EBOM-2009 EAc2.1:Existing Building Commissioning—Investigation and Analysisposted by David ESPAGNET on
Hello everybody. The Ashrae Audit realized for the LEED EBOM project i am in charge was completed more than 2 years before the performance period.
Are Underground Parking Areas included in CI LPD calculations
CI-2009 EAc1.1:Optimize Energy Performance—Lighting Powerposted by Amit Ahiel on
We have a project where the Tenant is taking over part of the Core and Shell building's underground parking and have cordoned off the area with fences and gates etc.
LEEDuser waste audit template updated
EBOM-2009 MRc6:Solid Waste Management—Waste Stream Auditposted by Tristan Roberts on
Hi — the waste audit template provided to LEEDuser members through our Doc Toolkit (see above) has been updated.
What if I don't know when/how much the vacuum was purchased for?
EBOM-2009 IEQc3.4:Green Cleaning—Sustainable Cleaning Equipmentposted by Victoria Bauer on
The building that I am currently working on getting LEED certification holds a contract with a janitorial service.
SSp1 fo contiguous sites
posted by Donald Green on
If you have several sites within the Campus Master Site whereby the projects are to be constructed at the same time and the project sites are contiguous, is there any way to not have a separate ESC
Restoration planned for future phase
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Heather DeGrella on
If the restoration of habitat is planned for a future phase, is waiting until the restoration is complete the only option a project has for submitting for this credit?
Blower Door Testing in non-smoking rooms
EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Emmanuel Pauwels on
In our hotel project, most rooms are non-smoking. Do they comply or do we have to test on all rooms even when they are designated as non smoking?
Daylight levels in spaces adjacent to atrium
EBOM-2009 IEQc2.4:Daylight and Viewsposted by Paulette Alioa on
Our project team is pursuing the Daylight credit for EBOM v2009, using the calculations path 3 - Measurement - for a renovated high school building that has a large central atrium space which featu
material overlap between IEQ credits 4.1, 4.2, and 4.3
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by KIMBERLY KRAFT on
Hello- We are submitting for IEQ credits 4.1, 4.2, and 4.3 and there are several materials that overlap all three of these categories, primarily carpet adhesive (which would fall under 4.1 and 4.3)
SS c4.2 calculate a Hotel occupancy
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Osama Hassan on
How we can calculate the total occupancy (all building users) of a Hotel building registered under NC v3? And if GBCI has reference documents (information).Thanks