Forum discussion

CS-2009 EAc1:Optimize Energy Performance

Which is the HVAC load installed by tenant owner's or tenant's?

The HVAC load in alternative path in LEED 2009 CS are counted as owner's load according to the instruction of two examples in "EAp2_TenantOwnerLoadAdjustment.xls". However, in case of HVAC systems installed by tenant, can I count it as tenant's load to calculate the percentage of energy cost controlled by owner?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Fri, 12/27/2013 - 15:14

Anything installed or influenced by the owner/developer counts toward this percentage. The HVAC in the tenant spaces typically counts as influenced since the building envelope affects this energy end use. Typically the only energy end uses not controlled or influenced tend to be the lighting and plug loads within tenant spaces.

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.