Forum quick links
GFA and other usage types on underground parking storey
posted by Maciej Starewicz on
This isue can be very confusing when it comes to detail. 1. Gross floor area (based on ASHRAE definition) sais that the calculation "excludes floor area dedicated to the parking and circulation of
Required signatories of whom?
NC-2009 EAp2:Minimum Energy Performanceposted by Ricardo Sá on
In the newest version (v4) of the LEED forms and specifically on the form for this credit there are several required signatories, however, there isn't any information regarding of who is supposed t
updated moderation rules for this page
posted by Tristan Roberts on
Some good discussion on this page -- thanks all.
Eligibility of PV systems receiving SRECs
NC-2009 EAc2:On-Site Renewable Energyposted by Adam Prince on
I apologize if this was covered explicitly in another discussion. In Massachusetts, there's a well-established SREC market.
Senior Living Community - Multiple Registrations really needed?
posted by Werner Maassen on
Our project entails an existing Senior Housing and Care Campus in California consisting of 10 buildings. Our client/owner/operator wants to achieve LEED Silver for 6 of the buildings which will be
Existing systems modeling
NC-2009 EAp2:Minimum Energy Performanceposted by Tiffany Moore on
If a project retains existing mechanical systems, but the overall scope of the renovations meets the new construction threshold, are the baseline calcs based on code-minimum or should the project a
Sidewalk clarification
Pilot-Credits PC14:Walkable Streetsposted by Michelle Oishi on
One of the requirements states, "At-grade crossings with driveways account for no more than 10% of the length of sidewalks within the project".
M&V case 2
CI-2009 EAc3:Measurement and Verificationposted by Chris Miller on
CI project, 75% or more of the space is occupied by the tenant, and I have seen the 4/1/12 addenda with the replacement language for Case 2.
Calculating FTE
posted by Nicole Kimoto on
I have 3 shifts in a 24-hour period. In the first shift, I have a total of 410 occupants during first 2 hours of that shift.
Natural ventilation in a Multifamily building
NC-2009 IEQp1:Minimum IAQ Performanceposted by Walter Parks on
We have an apartment building in which we have both mechanical ventilation and natural ventilation.