Rainwater collection and reuse on campus
NC-2009 WEc2:Innovative Wastewater Technologiesposted by Maya Karkour on
Hello, Our project is a new building on a school campus.
Technical rooms on the roof
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Hanne Goa on
Hello. We have 4 technical rooms on the roof of the building where the thought is to have vinyl flooring. Do this flooring also have to meet Floorcore standard?
Electric furniture
CI-2009 MRc5:Regional Materialsposted by Mathilda Jonsson on
Hi all I'm wondering about electrical supplies for some furniture, i. e height-adjustable work desks. Are these electrical components also included in the regional requirement?
MULTIPLE BUILDINGS CONNECTED AS ONE.
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Daniel Rohe on
I am trying to put together a water fixture inventory and calculations for an office complex that has three buildings built in different years that are attached as one building.
Sorting Cactus
NC-2009 WEc1:Water Efficient Landscapingposted by Omar Elrawy on
I have two questions, Should I categorize Cactus as a tree or as a shrub? Can I set all base-case to sprinkler, then the design case is to be dripping?
LEED Homes vs LEED NC for Dormitory with Faculty Apartments
posted by Timothy Casper on
I am working on a dormitory building at a boarding school that will also include faculty apartments. The student dorms will be comprised of single and double bedrooms.
Cafeteria/Training Room: Regurlarly Occupied Area?
NC-2009 PIf3:Occupant and Usage Dataposted by Silvia Ruiz on
I recently received a LEED Review asking me to include the caferia/training room into the regularly occupied area of my project, claiming that "only support areas such as copy rooms, storage, mecha
Process Loads Description
CI-2009 EAc3:Measurement and Verificationposted by Saju Varghese on
Im trying to find out what would be considered process loads to be metere separately, is there a definition from LEED?
Total Daily Uses: Some unisex bathrooms witout urinals...
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Silvia Ruiz on
Hi, The project I am working on has a bathroom set for women, a bathroom set for men (includes urinals), and two unisex bathrooms without urinals.
Waste water generation and treated water
CS-2009 WEc2:Innovative Wastewater Technologiesposted by Michael E. Edmonds-Bauer on
Our project has a big treatmet plant that is treating to tertiary standards not only blackwater but also graywater. The form automatically draws from the WEp1 the wastewater calculations consideri