We're trying to certify a building on our campus that contains the student health center. Each of the exam rooms has a sink in it for the doctor to wash hands before/after the exam. Do we need to include these in our calculations? Please advise.
I'd say that now that LEED HC is live and you are in LEED v3 that you can exclude them. Exam sinks are 'process water' in LEED HC and you want to maintain a decent flow rate. Explain this in a narrative.