Forum quick links
Tier 1: On-site renewable energy generation - excluded from LEED Boundary
NC-v4.1 EAc5:Renewable Energyposted by A&L SUSTENTABILIDADE on
Hi, everyone!
Purchasing - lamps
NC-v4.1 INc1:Innovationposted by Francesco Passerini on
Is Purchasing - lamps available as innovation credit in LEED BD+C v. 4.1?
I am not able to find an answer online.
Regards
Drywall Compound
NC-v4.1 EQc2:Low-Emitting Materialsposted by Catherine Blakemore on
Under what category does dryway compound fall for Low-Emitting materials?
Different Baseline HVAC System
NC-v4 EAp2:Minimum energy performanceposted by Amal Venugopal on
Greetings!..
Reference Evapotranspiration Rate
Schools-2009 WEc1:Water Efficient Landscapingposted by Shakir Ismail on
When LEED ask for the reference evapotranspiration rate (ETo) for the month of July in the WEc1 form, does it mean I should provide the daily ETo for the month of July (ETo rate per day), or should
GHG emission factor for 100% renewable electricity
NC-v4.1 EAp2:Minimum Energy Performanceposted by Vinh Huynh on
Hi,
Thermal Comfort Design alternative
NC-v4.1 EQc5:Thermal Comfortposted by SAMY Chamy on
Dear Concern
HVAC Backround Noise ( Process machine Noise)
NC-v4.1 EQc9:Acoustic Performanceposted by SAMY Chamy on
Dear Concern,
Zero lot line projects
NC-v4 SSc4:Rainwater managementposted by Gustavo De las Heras Izquierdo on
Path 3 states: "manage on site the runoff from the developed site for the 85th percentile ". I guess this requirement was made to exclude the sidewalk from calculations.