Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Omitting an area from the building

General forums
posted by  Mike D  on 

We are certifying an office building and there is one retail space at the ground floor of the building that the project team wants to omit from LEED certification. Can this be achieved? How?

2
Principal
Ackerstein Sustainability, LLC
LEEDuser Expert
545 thumbs up
Thu Feb 2, 2012, 4:32 pm

Lighting Fixture of equipment rooms in Data Centre

CI-2009 EAp2:Minimum Energy Performance
posted by  Natalie Wong  on 

We are now working on the lighting fixtures in a data centre. For the equipment rooms, if we follow the baseline in ASHRAE 90.7-2007 by using Space-by-space method i.e.

3
Thu Feb 2, 2012, 3:56 pm

MERV 13 in residences

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Iris Amdur  on 

Has anyone submitted a residential project that has pursued the intent of the MERV 13 filters in an alternate compliance path?

4
Default Avatar
Associate
Arup
LEEDuser Basic Member
9 thumbs up
Wed Feb 1, 2012, 11:40 pm

Mixed Use - Office/ Residential

EBOM-2009 MRc1:Sustainable Purchasing—Ongoing Consumables
posted by  Lauren Wallace  on 

My project contains 12 floors of commercial office space (95% occupied), a ground floor retail (100% occupied), and 30 stories of residential (30% occupied).

3
LEED Project Reviewer, LEED AP BD+C, Senior LEED Specialist
Certifications Department Manager, Epsten Group, Inc.
LEEDuser Basic Member
26 thumbs up
Wed Feb 1, 2012, 8:32 pm

Grouts

NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Bruce Maine  on 

Can someone tell me where 1168 or 1113 references "grout" for IAQ VOC requirements.

4
Technical Information & Public Affairs Manager
UL Environment
LEEDuser Basic Member
356 thumbs up
Wed Feb 1, 2012, 7:48 pm

Vacant Space FTE User Group

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Kelly Witosky  on 

We are working on a project that has completed the Preliminary Review Phase of Certification, this is a high-rise office building located in an urban area, with occupancy that fluctuated over the p

4
Wed Feb 1, 2012, 5:18 pm

When is the normal period to submit for design review phase?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Yuthdanai Somjitchob  on 

We have been working on our first LEED project in Thailand. We have been involved in the project since the beginning.

3
Tue Jan 31, 2012, 8:15 pm
9
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Jan 30, 2012, 3:18 pm
3
Sat Jan 28, 2012, 1:14 am

Is Reused Wood Flooring Required to be Certified?

CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systems
posted by  Nina Tallering  on 

Is reclaimed wood flooring required to be certified? Similar to EAc1.4 and MRc7, I would assume reused products would be exempt but I have not found a reference for this.

6
Default Avatar
Associate
hurleypalmerflatt
LEEDuser Basic Member
26 thumbs up
Fri Jan 27, 2012, 8:40 pm