Airflow measurement devices in manufacturing facility

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  LEED Pro Consultant  on 

Hello, We are working on a project which is an industrial plant, the building will be mechanically ventilated.

3
Sat Aug 2, 2014, 5:58 pm

Peak occupants and FTEs

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Jean-Baptiste Noel  on 

Hi all, For our project, we have 3 shifts of 8 hours each. For the first shift, there are 600 occupants, and for the 2 other shifts, there are 300 occupants.

6
Fri Aug 1, 2014, 10:16 pm

Net metering with one meter or two

NC-2009 EAc2:On-Site Renewable Energy
posted by  Brian Leet  on 

Marcus, Our project is a campus which is pursuing a PPA.

3
Default Avatar
Freeman French Freeman
LEEDuser Basic Member
0 thumbs up
Fri Aug 1, 2014, 7:31 pm

Required Water Heater efficiencies and Standby Losses

NC-2009 EAp2:Minimum Energy Performance
posted by  Matt Scott  on 

I'm having trouble interpreting Table 7.8 in 90.1-2007. The way the performance requirements are listed is confusing, especially for gas water heaters, but I'll get to that in a bit.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Aug 1, 2014, 7:27 pm

Beach Cleanup of Trash - credit?

EBOM-2009 MRp2:Solid Waste Management Policy
posted by  Nate Gillette  on 

All - our client goes out to the beach monthly and does a cleanup. It's mostly trash, including some not so nice items that you don't want to touch without gloves.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Aug 1, 2014, 5:19 pm

IPM - vendor not yet in place

EBOM-2009 IEQc3.6:Green Cleaning—Indoor Integrated Pest Management
posted by  Robert Cannellos  on 

Our project is implementing an IPM plan for the building but the vendor will not be identified until after construction is complete. We are preparing to submit for Design review.

3
LEED Fellow, WELL AP
JLL
LEEDuser Basic Member
125 thumbs up
Fri Aug 1, 2014, 3:44 pm

lab sink, kitchenette sink and shower water calculation rate

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  ebru unver  on 

We are working on NC Office Building Project. The building has 6 lab sinks, 3 kitchenette sinks and 9 showers (for guests, will be used maybe ones a week). Should we include to the calculation? Ho

5
LEED AP BD+C
ILTAY
LEEDuser Basic Member
3 thumbs up
Fri Aug 1, 2014, 1:41 pm

Hvac system Warehouse

NC-2009 EAp2:Minimum Energy Performance
posted by  Isabel Santos  on 

Dear all, I am modelling a warehouse that, in future, will have two tenants. It is expected to have two offices and one conference room, however there is still no hvac defined for these areas.

2
Fri Aug 1, 2014, 1:08 pm

Family restrooms?

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Joanna Jenkins  on 

In determining fixture groups, we have staff restrooms and public toilets; but, we also have one family restroom for visitors to the building.

4
Thu Jul 31, 2014, 5:26 pm

LOW VOC for vinyl tackboard adhesive

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Stephanie Santiago  on 

We are going to be installing Vinyl fabric faced tackboards at our current school project, NC v.2009, and are having trouble finding a compliant Low VOC adhesive.

2
Thu Jul 31, 2014, 5:21 pm