Wood Flooring from Italy
CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Sheela I on
We are installing wood flooring on our project and it is manufactured in Italy. As they do not have floor score certification - How can this product be documented?
Building Not Eligible for Energy Star Benchmarking - Outside U.S
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Amgad Khattab on
Our building is located in Egypt.
Can a smoking room be regarded as regulary occupied space?
CI-2009 IEQc8.2:Daylight and Views—Views for Seated Spacesposted by Noriko Nagazumi on
The definition of "regulary occupied space" is described as following; Regularly occupied spaces are areas where one or more individuals normally spend time (more than one hour per person per day o
Omitting an area from the building
posted by Mike D on
We are certifying an office building and there is one retail space at the ground floor of the building that the project team wants to omit from LEED certification. Can this be achieved? How?
Lighting Fixture of equipment rooms in Data Centre
CI-2009 EAp2:Minimum Energy Performanceposted by Natalie Wong on
We are now working on the lighting fixtures in a data centre. For the equipment rooms, if we follow the baseline in ASHRAE 90.7-2007 by using Space-by-space method i.e.
MERV 13 in residences
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Iris Amdur on
Has anyone submitted a residential project that has pursued the intent of the MERV 13 filters in an alternate compliance path?
Mixed Use - Office/ Residential
EBOM-2009 MRc1:Sustainable Purchasing—Ongoing Consumablesposted by Lauren Wallace on
My project contains 12 floors of commercial office space (95% occupied), a ground floor retail (100% occupied), and 30 stories of residential (30% occupied).
Grouts
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Bruce Maine on
Can someone tell me where 1168 or 1113 references "grout" for IAQ VOC requirements.
Vacant Space FTE User Group
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Kelly Witosky on
We are working on a project that has completed the Preliminary Review Phase of Certification, this is a high-rise office building located in an urban area, with occupancy that fluctuated over the p