Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Evaporative Chiller in EAp2?

NC-2009 EAp2:Minimum Energy Performance
posted by  Yastimy Jupson  on 

Hello everyone, i'm now joining a LEED project and the owner wants to use 50RT evaporative chiller in their building, but in ASHRAE standard 90.1, i cannot find the mandatory part for evaporative c

2
b.i.g. Bechtold DesignBuilder Expert
LEEDuser Basic Member
581 thumbs up
Wed Dec 10, 2014, 3:09 pm

Air Quality Testing after completion

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Mike Stopka  on 

Hello I have a project that is very close to LEED Gold. I am trying to lock down one more point. The project is in the final phase of the construction submission for LEED.

6
Tue Dec 9, 2014, 9:03 pm

Where do I enter residential units in form?

NC-2009 IEQc6.1:Controllability of Systems—Lighting
posted by  Maria Porter  on 

My project is a nursing home with some workstations for staff. In the form (v 4.0) on LEED Online there is nowhere to fill out what lighting controls the residents have.

2
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up
Tue Dec 9, 2014, 9:59 am

Exemption for Labs

CI-2009 EAc1.1:Optimize Energy Performance—Lighting Power
posted by  Amit Ahiel  on 

Let me preface my question with some context. I have a client (world famous for their electronic gadgets) who is building a lab for research and development of new gadgets and components.

5
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Mon Dec 8, 2014, 8:41 pm

Link to the v4 Water Calculator

NC-v4 WEp2:Indoor water use reduction
posted by  Dylan Connelly  on 

http://www.usgbc.org/resources/indoor-water-use-calculator

3
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Fri Dec 5, 2014, 10:24 am

Can Janitor closet be tied to restroom exhaust

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Leticia SooHoo  on 

Hello, we are working on a commercial office building project. We are intending to meet the requirements of IEQc5 by providing exhaust to the janitor closets.

2
Director - Green Building Advisory
Colliers International Ltd.
LEEDuser Basic Member
201 thumbs up
Fri Dec 5, 2014, 12:22 am

ANSI/BIFMA Testing Date vs Manufacture Date

CI-2009 IEQc4.5:Low-Emitting Materials—Systems Furniture and Seating
posted by  Nicole Schuster  on 

This credit requires that the manufacturing period must be within the certification period.

2
Default Avatar
LEED Consultant
The Green Engineer
LEEDuser Basic Member
188 thumbs up
Thu Dec 4, 2014, 9:40 pm

EAp2 Online form - Table EAp2-1. Space Usage Type -

NC-2009 EAp2:Minimum Energy Performance
posted by  Vassil Vassilev  on 

Greetings, There is a clarification question associated with a reviewer's remark. From the modeling software (Trace 700) reports, the spaces are divided to Regularly occupied and Unconditioned (as

5
Thu Dec 4, 2014, 9:20 pm

Providing clarifications to Design Phase Review

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Susannah Goddard  on 

Our project has just received the Design Phase Review feedback from USGBC and we are now in the process of addressing the issues raised with some of the credits.

7
Default Avatar
VP of Innovation
Sustainable Investment Group
LEEDuser Basic Member
110 thumbs up
Thu Dec 4, 2014, 4:05 pm

Retail Loading docks

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Sunayana Jain  on 

According to LEED for Retail, "employ permanent entryways systems for all entrances including back-of-house areas such as loading docks or service areas." In my case loading docks will only used f

5
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Thu Dec 4, 2014, 5:10 am