Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Threat factor calculation for operable shutters

Pilot-Credits SSpc55:Bird collision deterrence
posted by  Jessica Wuest  on 

Hi, I was wondering how to calculate operable shutters that cover clear glass.

2
Sites Technical Specialist, LEED
USGBC
LEEDuser Premium Member
47 thumbs up
Wed Sep 11, 2013, 9:04 pm
2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Wed Sep 11, 2013, 7:26 pm

Floor Leveling Product

Healthcare-v2009 IEQc4:Low-emitting materials
posted by  Catherine Blakemore  on 

Does a floor leveling product get listed as a floor coating?

4
Wed Sep 11, 2013, 5:47 pm

Ingress and egress

ND-v2009 NPDp3:Connected and open community
posted by  Colin Day  on 

Hi Eliot, Our project has two vehicle entries on its north side.

7
Sustainable Building Associate, LEED GA
The Institute for the Built Environment
LEEDuser Basic Member
0 thumbs up
Wed Sep 11, 2013, 2:39 pm

Basleine Fan Power credit for an exhaust fan linked to Furnace

NC-2009 EAp2:Minimum Energy Performance
posted by  Matt Scott  on 

I have an attic that is heated only with a Gas Furnace.

4
Manager, LEED
USGBC
LEEDuser Premium Member
26 thumbs up
Wed Sep 11, 2013, 1:59 pm

Ozonation for Lift Lobby Area

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Poorva Keskar  on 

The consultant has proposed an Ozonation System (IAQ Management System) for Lift Lobby area.

2
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Wed Sep 11, 2013, 10:24 am

Return Fan included in Baseline Fan Power Calc?

NC-2009 EAp2:Minimum Energy Performance
posted by  Matt Scott  on 

Another question regarding the baseline fan power calculation in the Tables 1.4 Excel spreadsheet: Does the calculation account for the possibility of a Return Fan in the proposed system?

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Sep 10, 2013, 7:48 pm

Energy modeling - Adjacente building

NC-2009 EAp2:Minimum Energy Performance
posted by  Luana Bertoletti  on 

Hi, I have a doubt when modeling proposed and baseline building.

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Sep 10, 2013, 6:47 pm

Need For Automated Shades

CS-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Brandon Scales  on 

I am currently working on a school project using option 2 on the IEQ 8.1 form. Many of the rooms have a VLTxWFR ratio that exceeds 1.8.

5
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Tue Sep 10, 2013, 6:38 pm

Construction EQ Management Plan

Healthcare-v2009 IEQc3.1:Construction IAQ management plan - during construction
posted by  Todd Bundren  on 

The requirements for the EQ Management Plan in the LEED for Healthcare 2009 seems to be different from the NC 2009 requirements. Does anyone have an example of this plan?

6
LEED Green Associate
GGO Architects
LEEDuser Basic Member
1 thumbs up
Tue Sep 10, 2013, 5:40 pm