Template issues for Option 1

Schools-2009 IEQp3:Minimum Acoustical Performance
posted by  renee jimenez  on 

Per the LEED reference guide it states that for Option 1 we are to “Confirm that 100% of all ceiling areas (excluding lights, diffusers and grilles) in all classrooms and core learning spaces are f

2
Daniel Hicks, E.I., INCE
Geiler & Associates
LEEDuser Basic Member
175 thumbs up
Tue Mar 20, 2012, 9:03 pm

A credit that's not in a category?

General forums
posted by  Nadav Malin  on 

Is anyone else concerned about the structure of this draft, in that the Integrative Process credit is floating off by itself, outside of any category?

3
Default Avatar
Senior Project Manager
CodeGreen Solutions
LEEDuser Basic Member
157 thumbs up
Tue Mar 20, 2012, 8:55 pm

Public Metering/Autocontrol Lavatory Faucet – Gallons per Cycle

General forums
posted by  Jeremy Cressman  on 

It appears that the metering faucet calculation providing a Gallons per Cycle option for flow rate has been removed from LEED 2012 Water efficiency prerequisite and Indoor water use calculation. I

4
Default Avatar
Senior Project Manager
CodeGreen Solutions
LEEDuser Basic Member
157 thumbs up
Tue Mar 20, 2012, 8:46 pm

Alternative Commuting

EBOM-2009 SSc4:Alternative Commuting Transportation
posted by  Aron Weis  on 

Does the fact that 80% of the people in the building I am evaluating for LEED-EB have FlexFuel cars help? Even if they do not use FlexFuel (Ethanol 85)?

10
Manager, LEED Technical Development
U.S. Green Building Council
LEEDuser Premium Member
123 thumbs up
Tue Mar 20, 2012, 7:08 pm

Sample of Measurement and Verification report for Option B?

NC-2009 EAc5:Measurement and Verification
posted by  Eric JS   on 

Dear all, Do you have any sample of Measurement and Verifiation report for Option B? Thank you and cheers!

3
Architect / LEED AP BD+C
KILTIK Consultoría
LEEDuser Basic Member
36 thumbs up
Tue Mar 20, 2012, 7:04 pm

Core Performance Guide Requirements for Efficiency

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Erik Dyrr  on 

To earn 5 points using Option 1: Equipment Efficiency, systems must comply with the efficiency requirements outlined in the Core Performance Guide.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Mar 20, 2012, 6:17 pm

Energy simulation

CI-2009 EAp2:Minimum Energy Performance
posted by  Pongthon Junnapat  on 

For LEED ID+C project, Do we have to include the entire building for energy simulation modeling? or just tenant scope of work Thanks in advance

5
Tue Mar 20, 2012, 1:28 pm

Exemplary Performance, Option 2, Path 4 (Non-Roof)

CI-2009 SSc1:Site Selection
posted by  Curt Pascoe  on 

This is a follow up to other exemplary performance (EP) discussions that have occurred. I understand that an EP point can be earned under Path 12 of this credit.

2
Principal
Emerald Built Environments
LEEDuser Basic Member
900 thumbs up
Tue Mar 20, 2012, 8:14 am

"Thumbs up" option?

General forums
posted by  Mara Baum  on 

Tristan, I've read several comments that I would agree with and would like to say the same thing, but the original comment is adequate or even better than my own ideas.

6
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Mon Mar 19, 2012, 11:32 pm

Corridors in Dwelling Units

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Omer Moltay  on 

Dear All, In a residential building with natural ventilation only, should corridors and entry halls in dwelling units be shown to be provided with outdoor air (meaning complying with requirements

2
Mechanical Engineer
Integral Group
LEEDuser Expert
342 thumbs up
Mon Mar 19, 2012, 10:41 pm