ESC PLAN Language
CS-2009 SSp1:Construction Activity Pollution Preventionposted by Esteban Undurraga on
Dear all, I think this question will be useful for people doing LEED outside the US.. Is it posible to upload the ESC plan in SPANISH? or I have to translate the whole document to English??
U-factor residential/nonresidential
NC-2009 EAc1:Optimize Energy Performanceposted by Francesco Passerini on
I’m modeling a hotel (5 storey, one floor is underground) in which there are also offices, a coffee bar, a wellness center...
Recertification Guidance
posted by Chris Munn on
Is the USGBC ever going to release guidance on recertification? I've been told for over a year and a half now to sit tight, because recertification guidance is on the way.
policy wording
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Jutta Berns on
our review just came back and the reviewers made the following comment: "The economic assessment policy is incomplete, as it does not require that maintenance cost savings be included in the econ
IEQc1_Densely and Nondensely Occupied Spaces
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by susan eguia on
Hi, How do we define nondensely spaces? To satisfy LEED requirements for this credit, do we really need to install CO2 sensors for densely and OA Measurement Device for nondensely?
Adjustable flush Valve Calculations
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Chris Stigler on
We are working on a large building pursuing EBOM certification.
Project Area
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Dominique Arrieta on
Hello, we have recently realized that our project gross area was one number, and the energy model done by our engineer did not include an atrium space in the middle of the project (project is on 3r
NPD Credit 11: Visitability and Universal Design
posted by Daniel Costantino on
Hello all, My project is considering pursuing NPD Credit 11. We are still narrowing down the various choices available under the credit.
Parking garage... outside project boundary
EBOM-2009 SSc7.1:Heat Island Reduction—Nonroofposted by CY Ng on
A separated 6-storey parking garage under the same management of our project building located next to our project site.