Forum quick links
ENERGY COST BUDGET METHOD, ENVELOPE
CI-2009 EAp2:Minimum Energy Performanceposted by TOMAS URIBE on
Greetings. I am working on a Commercial interior project pursuing the EAP2, and I chose the section 11 as an alternative to prescriptive approach, but, i am a little bit confused about how to sim
Concept Designers as CxA?
CS-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Ward Miller on
The project in question is a design and build project for which the general contractor will be assigned the project's design and construction activities; however, there is an architectural and engi
Can AE-1 be CxA?
NC-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by ANNE JURAN on
We prepared the RFP (or bridging documents) for a design-build project.
Compliance?
CI-2009 EAp2:Minimum Energy Performanceposted by Alex AC on
Hi LEEDuser community, I have read some old posts regarding this issue, but I still want to double check with you guys. I hope you don´t mind.
DES: virtual rate and efficiency
CS-2009 EAp2:Minimum Energy Performanceposted by FABIO VIERO on
Hello all, according to the document “Treatment of District or Campus Thermal Energy in LEED V2 and LEED 2009 – Design & Construction”, for Option1: Virtual District Hot Water Rate [$/MBTU] =
single stream recycling
EBOM-2009 MRc6:Solid Waste Management—Waste Stream Auditposted by Courtney Royal on
Our project is located in Ithaca, NY and curbside recycling pickup has moved into a single stream recycling collection.
Green Roof modeling for EAc1
NC-2009 EAc1:Optimize Energy Performanceposted by Kalyan Nishtala on
Hi All, I am modeling a 350,000 sqft dormitory/dining hall located in NY. Part of the roof of this building green roof (approximately 10%).
Establishing baseline system
NC-2009 EAc1:Optimize Energy Performanceposted by Kari Krolikowski on
My project consists of the following types of spaces: 1. Office: 2,300 SF 2. Manufacturing / laboratory: 24,055 SF 3. Warehouse: 26,905 SF 4.
Signage Shared?
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Joseph Greene on
We are required to designate 12 carpool spaces for our LEED project and plan to install pole mounted signs.
G3.1.2.9 and Miscellaneous Exhaust Fan Power
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Edwards on
Section G3.1.2.9 says that baseline "system fan electrical power for supply, return, exhaust, and relief (excluding power to fan-powered VAV boxes) shall be calculated" using the formulas given.