Hello, We are doing a CI-Retai. It is 5,814.13ft2 bank branch located in a mall. We used the whole builing method and got a review comment indicating that we need to recalculate the installed interior lighting power incluiding the ballast power. We got the ballast technical sheet but we don´t know which factor or how to recalculate the interior lighting power.
Thank you very much.