Topic | Recent |
---|---|
O+M: Retail or ID+C: CILEED Rating System Selectionposted by Yulia Chen on Jun 14, 2016, 4:50 pm
Hi, We are a tenant occupying 30% of a multi-tenant building. The office was last renovated in 2011. Is it possible for us to go for Commercial Interior cert even though we missed... |
|
C&S or NC?LEED Rating System Selectionposted by Claire PIMET on Jun 10, 2016, 10:44 am
I’m contacting you regarding a project in the center of Paris. The client wants to go with a LEED certification on this project. The project is an existing building and the major refurbishment... |
|
Major renovation for NC and C&SLEED Rating System Selectionposted by OSCAR DE LA RED on May 30, 2016, 3:13 pm
If there is not an exterior Work on envelope but there is a core MEP alteration ,could a project be certified as a NC LEED Project (or C&S)? According to the rating system selection guidance... |
|
LEEDv4- College Building Which Rating?LEED Rating System Selectionposted by ankur khandelwal on May 25, 2016, 3:39 am
We have a project in Texas which is having two Academic buildings (not connected) in a College, both of 4 floors having Lecture Theaters and Library. Will this be resisted in LEEDv4 BD+C: New... |
|
LEED NC: MR or LEED EBOMLEED Rating System Selectionposted by ABDUL MUTHALIB MOHAMED on Apr 22, 2016, 5:43 am
We have a manufacturing facility that under going addition of 30% of total floor area and wish to apply for LEED certification. Can we use the LEED NC? or Last reply: ABDUL MUTHALIB MOHAMED, Apr 23, 2016, 12:51 am |
|
Residential buildingLEED Rating System Selectionposted by Ana Paula Quiros on Apr 14, 2016, 1:34 pm
We have a residential building looking for certification. Which rating system would be more appropiate? New Construction or Core& Shell? Last reply: Tristan Roberts, Apr 15, 2016, 9:47 am |
|
Campus approach in a gated residential compound or ND?LEED Rating System Selectionposted by ABDELHAMID BESHARA on Feb 23, 2016, 3:38 pm
We have a gated Residential Compound consisting of around 60 buildings - 4 to 5 stories high - different models. The buildings are distributed on two main pieces of land of equal areas separated... Last reply: Eliot Allen, Apr 11, 2016, 11:21 am |
|
Hotel development- Multiple BuildingsLEED Rating System Selectionposted by Charalampos Giannikopoulos on Feb 11, 2016, 6:40 am
Would a project including the development of a luxurious resort hotel be eligible for certification under v4 NC? The project will consist of different buildings (reception, spa facilities,... Last reply: Charalampos Giannikopoulos, Apr 11, 2016, 4:38 am |
|
choosing between CS and HospitalityLEED Rating System Selectionposted by GBD Architects on Feb 12, 2016, 1:59 pm
Hi, we have a large project coming up that will be about 43% hotel and the rest CS. Would there be some benefit to selecting Hospitality, as we are within the "project's team choice" 40-60% floor... Last reply: Tristan Roberts, Apr 10, 2016, 8:16 am |
|
LEED CS 2009 Update from october 2010LEED Rating System Selectionposted by Valentin Grimaud on Feb 9, 2016, 9:48 am
I am currently looking for a PDF version of LEED rating system CS 2009 updated from october 2010. Current version on USGBC website is updated from 2013, but the project I'm currently... Last reply: Tristan Roberts, Apr 10, 2016, 8:07 am |