Log in
Forum » Credit Forums
Topic

Outdoor air in the Baseline Model

NC-v4 EAp2: Minimum Energy Performance
posted by Rajat Wadhwa on Apr 17, 2024, 3:06 pm

Hi , I am working on a lab space with 100% OA , for these spaces Cooling load is driving airflow, now the OA that we calculated for Proposed case is not sufficient to maintain the setpoint in the...

Last reply: Rajat Wadhwa, Apr 18, 2024, 12:22 pm

Does a "Hot Zone" in a Fire Station need individual door closers?

NC-v4 EQc1: Enhanced indoor air quality strategies
posted by Adrienne Franz on Apr 18, 2024, 10:09 am

Our Project is a Fire Station that has an area defined as a "hot zone" which includes the apparatus...

REACH and Global Green Tag certification count for the Optimization

NC-v4.1 MRc4: Material Ingredients
posted by Summer Gorder on Apr 17, 2024, 6:41 pm

Can REACH and Global Green Tag certifications count for the Optimization even if they aren't international projects?

Last reply: Dave Hubka, Apr 18, 2024, 8:29 am

Process Water and Arc

EBOM-v4.1 WEc1: Water Performance
posted by Jenni Betancourt on Apr 17, 2024, 10:00 am

I've been trying to communicate with Arc with no luch. We have Arc Essentials which supossedly could help us determining our potential score. Our building is industrial manufacturing, therefore...

Last reply: Reshadee Weerasooriya, Apr 18, 2024, 2:31 am

MERV 13 Filter for Inline Fresh Air Fan and Evaporative Cooler

CS-v4 EQp1: Minimum indoor air quality performance
posted by Nagaraj Sankar on Oct 31, 2023, 1:44 am

. It appears that we are encountering a persistent issue in our projects. Many of our projects are situated in Non-Attainment areas, and we are already using ...

Last reply: Afogreen Build, Apr 17, 2024, 9:00 pm

Bird glazing that meets quality views credit requirements

NC-v4 EQc8: Quality Views
posted by Blake Weaver on Dec 7, 2023, 10:01 am

I have an owner that is interested in installing bird glazing for their Airport project. We are pursuing the quality view credit which somewhat limits our options for bird safe glazing. Acid...

Last reply: Afogreen Build, Apr 17, 2024, 8:57 pm

Would a fire sprinkler system count as "other process water"

NC-v4 WEc4: Water metering
posted by Cindy Quinn on Apr 16, 2024, 9:08 pm

Has anyone had success with a fire sprinkler system being one of the subsystems?  Would it count as "other process water"?

TIA!

Last reply: Andrey Kuznetsov, Apr 17, 2024, 2:46 am

Waste management plan submission with multiple GC's

NC-v4 MRp2: Construction and demolition waste management planning
posted by Blake Weaver on Dec 21, 2023, 4:52 pm

I am working on a multiphase project where each phase has dramatically different scopes of work for the project and each has a different...

Last reply: Afogreen Build, Apr 16, 2024, 9:00 pm

No Cooling Tower

CS-v4 WEc3: Cooling tower water use
posted by Adriana Hansen on Jan 2, 2024, 11:46 am

Regarding the alternative compliance path to the LEED v4 credit Cooling tower water use (BD+C)<https://www.usgbc.org/node/2611780>, a...

Last reply: Afogreen Build, Apr 16, 2024, 8:57 pm

Pilot Closed- attending LEED v4.1 Optimize Process Water Use

Pilot-Credits WEpc94: No Cooling Tower
posted by Adriana Hansen on Apr 16, 2024, 1:45 pm

This pilot credit has been used in many office projects with VRF system and at least one of the baseline system(s) designated for the building using ASHRAE 90.1-2010 Appendix G Table G3.1.1...