Forum quick links
Work surfaces in Residential Units?
NC-v4 EQc6:Interior lightingposted by Kristen Magnuson on
Hello,
Option 2 - Strategy F: work surfaces comply but no movable partitions in the project
NC-v4 EQc6:Interior lightingposted by Benjamin Weise on
We are planning to comply with the strategies A, B, C and F. The strategies A, B and C should not pose a problem. However, I am not sure about strategy F:
Can you get an ID credit on a CI project from being in an EBOM certified building?
CI-v4 INc1:Innovationposted by on
Now that v4 has changed things a bit, I was wondering if I could apply the EBOM cert for an ID credit on my CI projects in a certified building.
Is this a Design or a Construction credit?
CS-v4.1 EAc5:Renewable Energyposted by Maria Porter on
Hi,
AIA Awards - defining beauty
posted by Jacob Knowles on
Hi Green Gurus,
A "fun" take-away from the sustainable MEP Leaders Summit (just ended today):
THERMAL COMFORT TOOL
Retail-CI-v4 EQc5:Thermal comfortposted by Toshif Ruikar on
Hi,
CBE, Thermal comfort tool is not longer useful for LEED documentation, is there any other way to do provide thermal comfort documentation which is acceptable to LEED.
LEED v4.1-EAc5-Renewable Energy - Green-e certified
NC-v4.1 EAc5:Renewable Energyposted by Jasmin Rajak on
Good day,
Drawings can be separately prepared and submitted?
CS-2009 SSc7.2:Heat Island Effect—Roofposted by Yuko Murata on
We are currently preparing the drawings to submit to USGBC.
IAQ Testing Post Constuction - Pre Occupancy
NC-v4 EQc4:Indoor air quality assessmentposted by Peter Del Sette, Jr on
I'm try to figure out how many tests I need to run for EQ3 V4.