Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

EAc5, Option #3 = MPR #6

NC-2009 EAc5:Measurement and Verification
posted by  Dave Hubka  on 

Why are project teams awarded a point for following the requirements of a Minimum Program Requirement? I am not complaining, I love free points!...

3
Wed Apr 23, 2014, 1:35 pm

Minimum daylight illuminance levels

CI-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Anna Bak  on 

Dear all, Could you please clarify what is the minimum daylight illuminance level to be achieved using option 1 - computer simulation? The credit language sais 10fc.

2
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Wed Apr 23, 2014, 12:59 pm

Classification of a room as "densly occupied"

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Anna Bak  on 

Hi, We have a project, where there are large directors' offices.

2
Wed Apr 23, 2014, 9:15 am

2 buildings - one certification

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Henrique Mendes  on 

Hello all! We are working on a project that will be two buildings, used for warehouses. The buildings are really close to each other and will share some systems and structures, such as the parking

3
Mr.
Green Domus | Desenvolvimento Sustentável
LEEDuser Basic Member
13 thumbs up
Tue Apr 22, 2014, 8:38 pm

Daylight analysis - inter-reflection

NC-2009 IEQc8.1:Daylight and Views—Daylight
posted by  Luana Bertoletti  on 

Hi, I have a doubt related to the considerations that should be assumed in order to perform the daylight analysis simulation.

8
Tue Apr 22, 2014, 8:13 pm

Potable water backup

NC-2009 WEc1:Water Efficient Landscaping
posted by  Heather Holdridge  on 

Can a project still earn 4 points under option 2 if a cistern has potable water backup? Could we demonstrate that it wouldn't be used through the path 1 calculations?

4
Tue Apr 22, 2014, 6:54 pm
17
Tue Apr 22, 2014, 11:50 am

Do all units have to run at 100% OA for this credit?

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Saju Varghese  on 

We have 4 A/C Units providing air conditioning to a building, two of them are 100% OA units and two of them are providing the total air supply cfm (OA + recirulated air) is 7000 cfm and 8600 respec

4
Mon Apr 21, 2014, 9:40 pm

LEED ND _Exam

General forums
posted by  Lakshmi Nair  on 

Hi Tristan , I am presently a LEED AP ( BD+C ). I was hoping to write LEED ND and become a LEED AP ( ND ). Should this be also done before June 15th ?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Mon Apr 21, 2014, 11:14 am

RH control with dew point control logic for IEQ 6.2

NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfort
posted by  J I  on 

This project is based in highly humid place, we have used dew point control logic for AHU control. In this control logic, we are controlling 2-way chilled water valve from signal from supply air

3
Default Avatar
President
Weatherby Design & Co. Engineers
LEEDuser Basic Member
67 thumbs up
Mon Apr 21, 2014, 10:45 am