Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

SSc4.3 Option 2: How long must charge stations be installed ?

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Kimberlyn Caoagas  on 

How long must charge stations be installed in order to be credit compliant? How is the project affected if clients remove charge stations if they are not being used?

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Sep 25, 2014, 7:49 pm
14
Default Avatar
Interior Designer
Jensen Yorba Lott Architects
LEEDuser Basic Member
0 thumbs up
Thu Sep 25, 2014, 7:00 pm

Dear all,
On my project, the

NC-2009 MRc4:Recycled Content
posted by  Caroline PIN  on 

Dear all, On my project, the concrete contains Fly Ash (6%) and recycled aggregates (5%). In the LEED Online Tab how can I enter this informations : can I add the two % (5% + 6%= 11%) ?

6
Default Avatar
In charge of environmental certification on a jobsite
EIFFAGE CONSTRUCTION
LEEDuser Basic Member
7 thumbs up
Thu Sep 25, 2014, 4:04 pm

No New Wood

NC-2009 MRc7:Certified Wood
posted by  Omar Elrawy  on 

Dear all, I actually have two questions; the first is that I have a wood product with only pre-consumer recycled content, I need just to confirm that this product is exempt from this c

3
Green Building Consultant | Researcher
GreenA Consultants
LEEDuser Basic Member
38 thumbs up
Thu Sep 25, 2014, 3:53 pm
3
CEO
Green Commons, LLC
LEEDuser Expert
586 thumbs up
Thu Sep 25, 2014, 2:26 pm

Concrete forming and temporary material - recycled content

NC-2009 MRc4:Recycled Content
posted by  Caroline PIN  on 

Dear all, Are the concrete wood forming and accessories (CSI division 03 11 00) can contribute to recycled content?

13
Building Enclosure Consultant
BPL Enclosure
LEEDuser Basic Member
58 thumbs up
Thu Sep 25, 2014, 2:08 pm

Re: IEQ4 Group 4 and fiberglass insulation products

Healthcare-v2009 IEQc4:Low-emitting materials
posted by  Chris Miller  on 

Fiberglass insulation is used for ductwork & insulating mechanical piping, does this insulation have to comply with the IEQ4, Group 4 requirements?

2
Wed Sep 24, 2014, 4:02 pm

Comment on Value and Purpose of IEQc3.2

NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancy
posted by  Dale Walsh  on 

As a Certified Industrial Hygienist with 28 years of experience conducting IAQ assessments and a Masters Degree in Toxicology/Industrial Hygiene with a thesis on new carpet emissions I want to stat

2
Default Avatar
LEEDuser Basic Member
1 thumbs up
Wed Sep 24, 2014, 1:45 am

Measuring distance to shower facilities

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  GTF CPRE  on 

Does anyone have a definitive answer on whether the 200 yard distance from LEED building to offsite showers for SSc4.2 is from LEED Building entrance to offsite BUILDING ENTRANCE, or to the door of

6
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Tue Sep 23, 2014, 6:12 pm

ID Credit for Herbs Garden

NC-2009 IDc1:Innovation in Design
posted by  MOHD HAFIZI MOHAMAD  on 

Hi All. Currently, we have more than 10 percent of herbs garden from our total landscape area. Can we scoring one point for ID? Thanks

2
Technical Director, LEED
USGBC
LEEDuser Expert
225 thumbs up
Tue Sep 23, 2014, 3:54 pm