Forum quick links
Hot desks as regularly occupied space?
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Paul Rogers on
Should an area designated for hot desking be included as a regularly occupied area? No single user will spend more than one hour per day at these workstations.
BMP area for a green roof
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Jamison Hill on
My project features raised green roof beds (6" deep soil) located directly downstream from a tin roof.
Simultaneously encouraging and frustrating...
posted by Brian Salazar on
Tristan - Nice article and review of the LEED "Feedback Plaque" as some folks are calling it. You asked for our feedback on the plaque itself as well and I have to admit that I'm conflicted.
Ventilation Effectiveness
NC-2009 IEQp1:Minimum IAQ Performanceposted by Dustin Balton on
I am working for a client who has a variable refrigerant HVAC system with a separate fully condition ventilator supplying fresh air.
Measuring for an Office Building with 92 Heat Pumps
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Alan Grant on
My client has an office building with one outside air supply fan supplying ventilation air throughout the three story building via ductwork to 92 heat pump units.
An unusual situation with Recycling Tickets
NC-2009 MRc2:Construction Waste Managementposted by Christine Castellano on
As the general contractor on a recently completed LEED project, all of the tickets I've received from the off-site waste separation facility listed the tonnage diverted by item, i.e., concrete, met
Fire Department Practice Burn
NC-2009 MRc2:Construction Waste Managementposted by Brian Leet on
We have a project on a large campus which has involved demolition of over a dozen buildings.
DES Option 2 - Clarification
NC-2009 EAc1:Optimize Energy Performanceposted by FABIO VIERO on
Hi, we are working on a LEED NC 2009 project consisting of an office building, where the thermal energy (heating via hot water) is generated and distributed by means of a municipal grid (about 40 m
PU foam
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Emmanuel Pauwels on
Under what category would a 1-compnent mounting Polyurethane foam fall and consequently what would be the maximum VOC level allowed?
No autosizing of equipment on proposed?
NC-2009 EAp2:Minimum Energy Performanceposted by Saju Varghese on
Is there a reason why the equipment on the proposed can not be autosized?