Forum quick links
Definition Parking space
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Hanne Goa on
Is car space for goods deliveries considered parking space aswell? This is a place for pick up and delivery of goods only (parking not allowed) Thank you!
USGBC DES Guidance - Option 1
NC-2009 EAp2:Minimum Energy Performanceposted by Maya Karkour on
Dear All, I just want to verify one thing regarding DES Option 1 (building stand-alone scenario): The cooling & heating are modeled as purchased energy (with identical energy rates $) in both
Do drawings need to have imperial units?
NC-2009 PIf4:Schedule and Overview Documentsposted by Nicole Kimoto on
I'm working on a federal project, and all dimensions are currently in metric. Does anyone know if LEED now accepts this or do I need to change to imperial units?
new files after D&C Preliminary Review
posted by jorge calderon on
In response to the preliminary review, before final review, Should I erase all wrong documents and just keep the new updated files?
timing on remediation - done before construction
NC-2009 SSc3:Brownfield Redevelopmentposted by Chris Flint Chatto on
Hello.
Process Load for Manufacturing
NC-2009 EAp2:Minimum Energy Performanceposted by Panupant Phapant on
Dear All, I have some question about my project, Our project is a cosmetic factory. Can I assume this project to Light Manufacturing type?
Pop-up irrigation systems
NC-2009 WEc1:Water Efficient Landscapingposted by Melissa Merryweather on
My guess is "no" but are pop-up systems any more efficient than conventional irrigation? I'm not getting a verifiable answer from my supplier. Any links or old LEEDuser thread appreciated.
Solatubes (tubular skylights) and Option 2 prescriptive method
Schools-2009 IEQc8.1:Daylight and Views—Daylightposted by Dana Murdoch on
We're having difficulty getting Solatubes to calculate correctly for the prescriptive (option 2) method.
Meter Declaration Requirements
EBOM-v4 WEp2:Building-level water meteringposted by LEED Pro Consultant on
Are we exempt of providing the meter declaration if the water-meter has been installed by the water company (government)? What would the criteria for this be?