Alternative Color to White RoofNC-2009 SSc7.2: Heat island effect - roofposted by Tysa Tenebro on Apr 19, 2010, 1:38 pm
Is there any color besides White roof comply with the said Credit (NC 2009 SSc7.2: Heat Island Effect—Roof)? Please advise. Thanks. Last reply: Dave Koons, Apr 21, 2010, 8:35 pm |
|
Areas of questionCI-2009 IEQc3.2: Construction IAQ management plan - before occupancyposted by Elizabeth Repin on Jan 22, 2010, 6:20 pm
We have a food distribution warehouse. Would the 82,000 sq foot freezer need... Last reply: Shannon Gray , Apr 21, 2010, 4:32 pm |
|
Commissioning Authority's Documented ExperienceNC-2009 EAp1: Fundamental Commissioning of Building Energy Systemsposted by Jose Salinas on Apr 21, 2010, 12:11 pm
Hi all, Last reply: Chris Ladner, Apr 21, 2010, 12:34 pm |
|
Should Epoxy be tested?NC-2009 IEQc4.4: Low-emitting materials - composite wood and agrifiber productsposted by Maya Karkour on Apr 21, 2010, 6:07 am
Hello, Would anybody know if Epoxy also needs to be tested for added... Last reply: Tristan Roberts, Apr 21, 2010, 11:10 am |
|
Why restrict to 'medical' processes?Pilot-Credits EApc3: Medical and process equipment efficiencyposted by Jean Marais on Apr 21, 2010, 12:59 am
Reducing process loads of all types should be a LEED insentive credit wize, but is often pushed back due to the difficalties documenting the exceptions to ASHRAE 90.1 Appx. G for differing... Last reply: Tristan Roberts, Apr 21, 2010, 1:34 am |
|
Get the most out of LEEDPilot-Credits PC5: Preliminary Integrative Project Planning & Designposted by Jean Marais on Apr 21, 2010, 1:14 am
This is great, because it will not only maximise the potential of creating greener buildings using LEED as the guide, but also solve so many problems and headaches during the LEED certification... |
|
Required DatesCI-2009 IEQc4.5: Low-emitting materials - systems furniture and seatingposted by MICHELE HENDRICK on Apr 19, 2010, 1:52 pm
The dates that are required for this credit are very confusing. For Option B "practices must have started before the start of manufacturing but no earlier than 24 months prior to the last... Last reply: Tristan Roberts, Apr 20, 2010, 8:36 am |
|
Dual Flush- average flow rateNC-2009 WEp1: Water Use Reductionposted by Adriana Hansen on Apr 19, 2010, 3:50 pm
According to the calculation showed at document WATER USE REDUCTION - ADDITIONAL GUIDANCE v011209, the average flow rate is defined by: [(Male full-flush uses/day×full-flush rate)+(Female... Last reply: Jean Marais, Apr 20, 2010, 3:29 am |
|
FSC ExclusionNC-2009 MRc7: Certified Woodposted by Emily Kildow on Feb 9, 2010, 11:15 am
Has anyone ever heard of a project achieving this credit with an exclusion of certain... Last reply: Sheri Lucas, Apr 19, 2010, 10:31 pm |
|
Retail Space and EAp2/EAc1EBOM-2009 EAp2: Minimum Energy Efficiency Performanceposted by D. G. on Apr 2, 2010, 8:08 pm
My question is about retail space and EAp2/EAc1. According to page xxiii of the Reference Guide, up to 10% of the floor area can be exempted from all credits (except EQp2) for multitenant... Last reply: D. G., Apr 19, 2010, 10:14 pm |