Determining Recycled-Content ValueNC-2009 MRc4: Recycled Contentposted by Evan Shook on May 25, 2010, 9:15 am
In the reference guide there are a few different ways to determine... Last reply: Tristan Roberts, May 25, 2010, 1:51 pm |
|
Common Dumpsters for Numerous ProjectsCI-2009 MRc2: Construction Waste Managementposted by Kristy O'Hagan on Mar 10, 2010, 11:35 am
In a retail project within a shopping center redesign, common dumpsters will be used during demolition and construction for all tennants. There will be co-mingled recycling and recycling rates... Last reply: Victoria Lockhart, May 25, 2010, 11:46 am |
|
Use of LEED Retail Draft credit SS 4CS-2009 SSc4.1: Alternative transportation - public transportation accessposted by V. Miller on May 20, 2010, 8:21 am
I am working on a CS V.3 retail project. Rather than using the standard V3 SS 4.2 requirement, I'd like to use SS 4, Option B from the LEED for Retail Draft Reference Guide inlcuded below. Would... Last reply: Tristan Roberts, May 24, 2010, 9:31 pm |
|
exemplary credit: two commuter train, light rail, or subway lineNC-2009 SSc4.1: Alternative transportation - public transportation accessposted by Anthony Bandy-Zalatoris on May 24, 2010, 9:46 am
Would a BRT (Bus Rapid Transit) line qualify as a... Last reply: Mara Baum, May 24, 2010, 9:00 pm |
|
APPA Custodial Staffing GuidelinesEBOM-2009 IEQc3.2: Green cleaning - custodial effectiveness assessmentposted by Rachael McClain on May 24, 2010, 2:01 pm
I was wondering if it was necessary to purchase the Custodial Staffing Guidelines handbook or are the guidelines provided in the LEED reference guide and through LEEDuser enough to conduct the... Last reply: Tristan Roberts, May 24, 2010, 8:16 pm |
|
rented equipmentEBOM-2009 IEQc3.4: Green cleaning - sustainable cleaning equipmentposted by Rachael McClain on May 24, 2010, 2:35 pm
We rent equipment to do interim cleanings in-house, for example carpet cleaners can be rented. As long as the rented carpet cleaner meets the sustainable criteria we are still meeting the... Last reply: Tristan Roberts, May 24, 2010, 8:13 pm |
|
one moreNC-2009 WEp1: Water Use Reductionposted by Josephine de Montmarin on May 17, 2010, 12:33 pm
For a hotel, should the default uses of kitchen and maintenance sinks be... Last reply: Karen Blust, May 20, 2010, 7:06 pm |
|
Methodology for calculating a (7) Seven Day A Week SurveyEBOM-2009 SSc4: Alternative Commuting Transportationposted by Reynaldo Castro on Apr 13, 2010, 8:56 pm
Hello we are a Convention Center open seven days a week. The instructions given for the survey are for a 5 day week scenario. How do you figure for a seven day a week scenario. Last reply: Matthew Macko, May 20, 2010, 1:43 pm |
|
Stream Channel Protection? (case 1, option 2)NC-2009 SSc6.1: Stormwater design - quantity controlposted by Joshua Radoff on Apr 30, 2010, 1:13 pm
Has anyone out there had any success using the Stream Channel Protection option (Option 2 for CASE 1) where the existing impervious is less than 50%? I've got an urban project (in Denver... Last reply: Gregory Hurst, May 20, 2010, 1:01 pm |
|
clarifyEBOM-2009 SSc4: Alternative Commuting Transportationposted by Jonathan Weiss on Feb 9, 2010, 12:26 pm
I think what Robert is asking is whether LEED means "to and from the building once a day" (round trip), or "to and from the building twice a day" which means two round trips. I would... Last reply: Jenny Carney, May 20, 2010, 12:23 pm |