Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Eligible CxA for Design&Built project

NC-2009 EAc3:Enhanced Commissioning
posted by  Panupant Phapant  on 

Hi We are working on the project that the owner performs both design and construction activities.

2
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Sun Mar 22, 2015, 1:27 am

Forms Update

General forums
posted by  Rachael Vidulich  on 

I need to update my forms on LEED online as most of them are v01 and have "BETA" listed at the bottom.

3
Default Avatar
Project Engineer
The Augustine Company
LEEDuser Basic Member
0 thumbs up
Fri Mar 20, 2015, 7:48 pm

One Shift Peak FTE vs Daily Average

NC-2009 PIf3:Occupant and Usage Data
posted by  Tommy Linstroth  on 

Hi, I'm working on an outpatient clinic that has 1 shift of workers (8-4, 5 days/week). Per the owner, there are 52 FTE. Since there is only 1 shift, this is the peak and the daily average.

2
Default Avatar
Sustainability Architect
LEEDuser Basic Member
88 thumbs up
Fri Mar 20, 2015, 4:35 pm

cxa requirements

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  andres ramirez  on 

Hi I’m an arquitect and I just got the CPMP-commissioning certification from ASHRAE, I’ve been working already in 4 leed projects as a leed project manager.

3
Thu Mar 19, 2015, 10:16 pm

Energy And Water Data Release Form

General forums
posted by  Katherine Dubyk  on 

I'm working on a project with a government client who has opted to share infromation via Option 1, however are very perplexed as to why they are required to submit this additional form because they

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Mar 19, 2015, 7:31 pm

Bike racks/storage for retail customers in mixed use building

CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  Charles Nepps  on 

Our project is mixed use office and retail. Secure bike storage is provided in the parking garage for regular building occupants.

2
Thu Mar 19, 2015, 4:15 pm

Fire suppression system

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  FABIO VIERO  on 

Hi all,I'm now working on a project under LEED certification that aims to achieve IEQc5. Hazardous gas and chemical use areas are served by sprinkler system as a fire suppression system.

2
Thu Mar 19, 2015, 2:06 pm

No external hardscape

EBOM-2009 SSc2:Building Exterior and Hardscape Management Plan
posted by  FABIO VIERO  on 

Hi all, I'm now working on a building without exterior hardscape (the LEED boundary is based on the building footprint).

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Thu Mar 19, 2015, 2:05 pm

Equipment which uses NO water

Healthcare-v2009 WEc4.3:Water use reduction - food waste systems
posted by  Gustavo De las Heras Izquierdo  on 

Hallo, I've seen in a brochure some equipments which do not use water. Do these devices make us eligible and qualify automatically for this credit?

4
Thu Mar 19, 2015, 12:14 am

Calculating Materials vs. Construction vs. Project costs

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Jessica McNaughton  on 

The default materials calculation is 45% of construction costs (Div 3-10 primarily). Is there a generally accepted percentage of project costs that is considered to be construction costs?

2
LEED-AP BD+C
GREENSQUARE
LEEDuser Expert
261 thumbs up
Wed Mar 18, 2015, 8:49 pm