Energy modeling of an open roof stadium in a hot climate
NC-2009 EAp2:Minimum Energy Performanceposted by Mario S. on
Good day, I have the following question regarding the energy modeling of a very large soccer stadium in a hot climate: My proposed design involves floor mounted and side mounted jet fans that are
SSpc14 Walkable project Site
Pilot-Credits PC14:Walkable Streetsposted by Amanda Johnson on
I am trying to register for this Pilot Credit (which is not listed as closed) Both LEED Online and LEED User link to the USGBC Credit Library, but in the credit Library I find no link to register.
Developement on EAp2?
posted by Jean Marais on
Are there any plans to do the same sort of thing with EAp2?
Actual Material Cost vs. Material Cost: what's the difference?
NC-2009 MRc4:Recycled Contentposted by Marcio Alberto Casado Pereira on
We received a review comment regarding credits MRc4 and MRc5 of a stadium we are working on in Brazil.
Categorizing a LEED project
posted by Adi Negara, LEED AP BD+C on
Hello all, I have a difficulty in determining the appropriate LEED rating system for a project, and I hope that you all can tell me what rating system is best suited to the project: The project ow
LEED NC or EBOM ?
posted by Fabio Frescia on
Hi, We just got a project here in Thailand that just started, where our client would like to achieve a LEED certification. It's an existing resort and they want to renovate it.
District cooling system with different construction planning
NC-v4 EAp2:Minimum energy performanceposted by Jeroen Sap on
I have a project at hand with a high LEED ambition. They have the opportunity to connect to a future district cooling system (high efficiency).
Car Dealership
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Robert Shields on
We are working on a project to build a Toyota Dealership in Pennsylvania and the owner is seeking LEED Certification (LEED 2009).
Project Specific Questions
CI-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Lauren Sparandara on
Please help advise for these two questions.
School project - Group certification
posted by Maya Karkour on
Hello, we are working on a new K12 school project with 4 separate buildings (2 bldgs for classrooms, 1 administration and 1 sports center).