LEED documentation with IES-VE
NC-2009 EAc1:Optimize Energy Performanceposted by Mark Benson on
For EAp2/EAc1, what specific documentation does GBCI expect to see from a model built in IES VE?
Sports Practice Facility FTEs vs Transients
posted by David Browne on
I am working on an indoor practice facility for a university Division 1 athletic program and am having a difficult time deciding how to enter FTEs and transients in a project information form.
Ambiguity re: detention as an acceptable solution
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Michael Wironen on
Folks: We have a project (existing imperviousness > 50%) where we have calculated that through a combination of green roof, pervious pavers, landscaped open space, and a rainwater cistern we ca
ID credits earned in Base Bldg vs CI
CI-2009 IDc1:Innovation in Designposted by Sheryl Swartzle on
Our CI's base bldg earned LEED Gold which included ID credits for green cleaning, education, and low mercury lamps.
furniture in building reuse
CI-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Yaser Al Sharif on
1.please can any one help me how to calculate the Office Systems Furniture? it is not clear for me ... we have retained all offices furniture and we didn't buy any thing new
Interior or Exterior Lighting fixture in residential project
NC-2009 EAp2:Minimum Energy Performanceposted by VICTOR MORENO on
We are developing a building energy modeling of a residential building based on 90.1-2007. The dwelling units have exterior areas (balconies) that have luminaires. These luminaires have to be mod
footprint clarification
NC-2009 PIf2:Project Summary Detailsposted by Jennifer Ratts on
What is the difference between gross square footage undergoing inital fit-out and groww square footage undergoing alteration?
Can someone help the new guy? Thanks?
NC-2009 IEQc7.1:Thermal Comfort—Designposted by C M E on
So I recently got hired, and the first thing they have me working on is getting familiar with LEED credits and completing the forms.
Can I defer any ID credit to submit it w/ construction package ?
NC-2009 IDc1:Innovation in Designposted by Matt Dem on
Hi, I previously filed an innovation credit with my design preliminary submission and received an comment from GBCI therefore it is pending.
Projects with basements
Healthcare-v2009 IEQc8.2:Daylight and views - viewsposted by Shannon Roberts on
I am working on a Clinic that has one basement floor entirely below grade.