Concrete and steel - first point 10%
Healthcare-v2009 MRc3:Sustainably sourced materials and productsposted by LEEDme Lorenzi on
Good morning, I write to ask your opinion regarding the phrase at the beginning of the credit "If concrete or steel structural elements are applied toward this credit, the project must include at l
cost of IAQ testing?
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Tristan Roberts on
What costs have you found for IAQ testing under this credit? Per SF? Per test? Every project is different but I'm curious for your anecdotal experience, for updating our Cost of LEED report.
LEED CI
posted by Agnieszka Rylska on
Our client is going to lease the whole building (which is being renovated right now) and he is considering LEED certification for his office. He will be responsible for fit-out preparation.
Qualifying Scope for Enhanced Cx
CS-2009 EAc3:Enhanced Commissioningposted by Alexis Voeltner on
I am working on a project where the only permanently installed system that could be commissioned under the core & shell scope is the exterior lighting controls.
Domestic Water Heating
NC-2009 EAp2:Minimum Energy Performanceposted by David Mirabile on
I am modeling a school in which we are using several water-to-water geothermal heat pumps for our domestic water heating.
Modeling fans for tenant areas for a C&S Project
CS-2009 EAp2:Minimum Energy Performanceposted by Santiago Rodriguez on
Hello, I did some research to find a similar question on this forum before posting it, but even though there were several questions related to the topic, I did not find the exact situation: We a
WaterSense Labeled Products
NC-v4 WEp2:Indoor water use reductionposted by Rick Ellison on
Reference Guide indicates WaterSense label requirements are mandatory in U.S. Right now the program for the WaterSense label on toilet flushometers is still in draft stage.
Help w/ wrangling RECs.
CS-2009 EAc2:On-site Renewable Energyposted by Brian Salazar on
Preface: LEED CS v3.0 Project in Massachusetts. Our project is designed to produce 16% on-site renewable energy. The energy is fed directly into the building and used by the building.
Questions about High-rise residential LEED Energy Modeling
NC-2009 EAc1:Optimize Energy Performanceposted by Tommy Xing on
Hi, I’m working on a High-rise residential LEED energy modeling project now. I have a question regarding the lighting.
Compliant area
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by David Browne on
Perhaps this a dumb question, but would someone please clarify this for me? I am currently attempting this credit on two projects.