Forum quick links
G3.1.1 Exception a
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
I have a convention center project where it has a exhibit hall with high process load. It is larger than 20k ft2.
Reserved parking on existingcampus parking area outside building
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by LEEDme Lorenzi on
We have a new office project inside a campus, there is an existing big parking area serving the campus not adiacent to the building, no parking are allocated inside our LEED boundary and not new pa
Stormwater inspection
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Charalampos Giannikopoulos on
Both uploads SSc6-3 and SSc6-4 require the provision of “a copy of the most recent stormwater inspection and a log showing that any needed maintenance or repairs were performed within 60 days of th
Energy recovery from a nearby data center?
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
We have a project that is planning to use energy recovery from a nearby data center. The rest of the heat and cooling are provided by a district plant.
Fume hood exhaust fan process load?
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
I think fume hood exhaust are unregulated in 90.1 2007 thus should be process load. But just want to confirm. I do see EPAct 2005 says fume hood should not be treated as process load...
Basline system for 5 floors + small below grade conditioned spac
NC-2009 EAp2:Minimum Energy Performanceposted by Zonda E. Team on
What is in your opinion the baseline for the following building: Floor area:12,000 sqm (130,000 sqft) Floors: 5 above grade, mostly conditioned.
Pre-development Conditions
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Leandro Silva on
Greetings Our project is a 30 year old building undergoing a Major Renovation and will be registered as LEED-NC v2009. In calculating pre- and post-development runoff, do we consider the pre-develo
Is the credit for during construction, or after envelope is up?
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Nelina Loiselle on
We have an issue with a General Contractor on a project.
SS 4.4 No New Parking.
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Rezkar Abdulmajeed on
I have the first LEED project in a campus. The project will be built on an existing parking lot and no new parking will be added within the LEED project boundary.
Fuel Stations for Shared Parking Lot Outside of LEED Boundary
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Mary Kay on
Our project has no new parking. We are on a campus where there is an existing parking lot adjacent to our building, but not within our LEED project boundary.