G3.1.1 Exception a

NC-2009 EAp2:Minimum Energy Performance
posted by  Haojie Wang  on 

I have a convention center project where it has a exhibit hall with high process load. It is larger than 20k ft2.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed Jul 8, 2015, 4:33 pm

Reserved parking on existingcampus parking area outside building

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  LEEDme Lorenzi  on 

We have a new office project inside a campus, there is an existing big parking area serving the campus not adiacent to the building, no parking are allocated inside our LEED boundary and not new pa

2
Default Avatar
Building Performance Specialist
WSP Built Ecology
LEEDuser Basic Member
2 thumbs up
Tue Jul 7, 2015, 9:29 pm

Stormwater inspection

EBOM-2009 SSc6:Stormwater Quantity Control
posted by  Charalampos Giannikopoulos  on 

Both uploads SSc6-3 and SSc6-4 require the provision of “a copy of the most recent stormwater inspection and a log showing that any needed maintenance or repairs were performed within 60 days of th

3
Tue Jul 7, 2015, 2:07 pm

Energy recovery from a nearby data center?

NC-2009 EAp2:Minimum Energy Performance
posted by  Haojie Wang  on 

We have a project that is planning to use energy recovery from a nearby data center. The rest of the heat and cooling are provided by a district plant.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Mon Jul 6, 2015, 4:30 pm

Fume hood exhaust fan process load?

NC-2009 EAp2:Minimum Energy Performance
posted by  Haojie Wang  on 

I think fume hood exhaust are unregulated in 90.1 2007 thus should be process load. But just want to confirm. I do see EPAct 2005 says fume hood should not be treated as process load...

3
Default Avatar
Energy Modeler
KJWW Engineering
LEEDuser Basic Member
3 thumbs up
Mon Jul 6, 2015, 4:07 pm

Basline system for 5 floors + small below grade conditioned spac

NC-2009 EAp2:Minimum Energy Performance
posted by  Zonda E. Team  on 

What is in your opinion the baseline for the following building: Floor area:12,000 sqm (130,000 sqft) Floors: 5 above grade, mostly conditioned.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Sat Jul 4, 2015, 7:31 pm

Pre-development Conditions

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  Leandro Silva  on 

Greetings Our project is a 30 year old building undergoing a Major Renovation and will be registered as LEED-NC v2009. In calculating pre- and post-development runoff, do we consider the pre-develo

2
Regional Stormwater Leader
Arcadis North America
LEEDuser Expert
144 thumbs up
Fri Jul 3, 2015, 6:26 pm
6
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Fri Jul 3, 2015, 6:18 pm

SS 4.4 No New Parking.

NC-2009 SSc4.4:Alternative Transportation—Parking Capacity
posted by  Rezkar Abdulmajeed  on 

I have the first LEED project in a campus. The project will be built on an existing parking lot and no new parking will be added within the LEED project boundary.

5
Fri Jul 3, 2015, 2:16 pm

Fuel Stations for Shared Parking Lot Outside of LEED Boundary

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Mary Kay  on 

Our project has no new parking. We are on a campus where there is an existing parking lot adjacent to our building, but not within our LEED project boundary.

2
President
HJKessler Associates
LEEDuser Basic Member
41 thumbs up
Fri Jul 3, 2015, 1:39 pm