Log in
Forum » Credit Forums
Topic

Retail Customer

CI-2009 WEp1: Water Use Reduction
posted by Simon Sue on Aug 18, 2010, 2:51 am

i have some question here. i did a calculation of the number of retail customer base on table 3. (pg 105) which i choose to use retail space under " service". expected customer is 28ppl per day...

Last reply: Tristan Roberts, Aug 20, 2010, 1:18 am

cafeteria as special use space?

EBOM-2009 IEQc2.2: Controllability of systems - lighting
posted by Pablo Fortunato Suarez on Aug 18, 2010, 3:10 am

Pardon the re-post. This was included in an earlier thread but might have been over-looked:

1) Is it safe to assume that cafeterias fall under "special use spaces"? Special-use spaces...

Last reply: Tristan Roberts, Aug 20, 2010, 12:52 am

Successful PBT avoidance

Pilot-Credits PC2: PBT Source Reduction: Dioxins and Halogenated Organic Compounds
posted by Abena Darden on Jul 13, 2010, 4:47 pm

I would be interested in knowing if any LEEDUser out there has had a project successfully earn the PBT avoidance credit. What were the challenges and barriers? How knowledgeable were the...

Last reply: Tristan Roberts, Aug 20, 2010, 12:41 am

No Green Products available

EBOM-2009 SSc3: Integrated Pest Management, Erosion Control, and Landscape Management Plan
posted by Chris Munn on Aug 19, 2010, 2:41 pm

I am working with a client that has automist dispensers for fly control near the building entrances. The dispensers are not LEED compliant, but apparently the pest control service claims there...

Last reply: Tristan Roberts, Aug 20, 2010, 12:37 am

Option 3 Daylight Measurement

NC-2009 IEQc8.1: Daylight and views - daylight
posted by Norma Lehman on Aug 17, 2010, 2:51 pm

we took readings on a 10'-0" grid as the "documentation toolkit" indicates. In some cases, our...

Last reply: Jill Perry, PE, Aug 19, 2010, 7:23 pm

Metered Energy Use

NC-2009 EAc5: Measurement and Verification
posted by Rebecca Molldrem on Aug 9, 2010, 9:12 am

The credit requirements say, "The M&V period must cover at least 1 year of post-construction occupancy". This however, isn't saying that we can't complete this credit until one year after...

Last reply: Marcus Sheffer, Aug 19, 2010, 4:41 pm

Computer load

CS-2009 EAp2: Minimum Energy Performance
posted by Diana Wellenbrink on Aug 18, 2010, 11:11 pm

Should a computer be calculated as 400W or according to Energy star in our case 175 KWh/annual or around 80 W?: ref: http...

Last reply: Christopher Schaffner, Aug 19, 2010, 8:05 am

Outdoor Track

Schools-2009 SSc7.1: Heat island effect - nonroof
posted by Linda Davisson on Aug 18, 2010, 12:14 pm

Our school project has an outdoor track made of rubber. Is this considered a hardscape or can it count as open space?

Thanks

Last reply: David Posada, Aug 18, 2010, 12:28 pm

Pressure of water supply for faucets/showerheads

EBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by Yong Lee Low on Jul 27, 2010, 4:10 am

Does the flow rate to be specified in the online template for all the kitchen/public and private lavatory faucets/showerheads to be at a specific PSI? For. eg. the showerhead used in the building...

Last reply: Jenny Carney, Aug 18, 2010, 11:45 am

Original Building Compliance

CI-2009 IEQc7.1: Thermal comfort - design
posted by Jeremy Kuhre on Aug 12, 2010, 4:40 pm

I'm a little new to LEED CI (got my AP cred. in NC) and have had intermittent confusion on the scope of LEED CI certification. As I understand it, only work performed as part of the tenant fit-...

Last reply: Jeremy Kuhre, Aug 18, 2010, 11:40 am