Retail CustomerCI-2009 WEp1: Water Use Reductionposted by Simon Sue on Aug 18, 2010, 2:51 am
i have some question here. i did a calculation of the number of retail customer base on table 3. (pg 105) which i choose to use retail space under " service". expected customer is 28ppl per day... Last reply: Tristan Roberts, Aug 20, 2010, 1:18 am |
|
cafeteria as special use space?EBOM-2009 IEQc2.2: Controllability of systems - lightingposted by Pablo Fortunato Suarez on Aug 18, 2010, 3:10 am
Pardon the re-post. This was included in an earlier thread but might have been over-looked: 1) Is it safe to assume that cafeterias fall under "special use spaces"? Special-use spaces... Last reply: Tristan Roberts, Aug 20, 2010, 12:52 am |
|
Successful PBT avoidancePilot-Credits PC2: PBT Source Reduction: Dioxins and Halogenated Organic Compoundsposted by Abena Darden on Jul 13, 2010, 4:47 pm
I would be interested in knowing if any LEEDUser out there has had a project successfully earn the PBT avoidance credit. What were the challenges and barriers? How knowledgeable were the... Last reply: Tristan Roberts, Aug 20, 2010, 12:41 am |
|
No Green Products availableEBOM-2009 SSc3: Integrated Pest Management, Erosion Control, and Landscape Management Planposted by Chris Munn on Aug 19, 2010, 2:41 pm
I am working with a client that has automist dispensers for fly control near the building entrances. The dispensers are not LEED compliant, but apparently the pest control service claims there... Last reply: Tristan Roberts, Aug 20, 2010, 12:37 am |
|
Option 3 Daylight MeasurementNC-2009 IEQc8.1: Daylight and views - daylightposted by Norma Lehman on Aug 17, 2010, 2:51 pm
we took readings on a 10'-0" grid as the "documentation toolkit" indicates. In some cases, our... Last reply: Jill Perry, PE, Aug 19, 2010, 7:23 pm |
|
Metered Energy UseNC-2009 EAc5: Measurement and Verificationposted by Rebecca Molldrem on Aug 9, 2010, 9:12 am
The credit requirements say, "The M&V period must cover at least 1 year of post-construction occupancy". This however, isn't saying that we can't complete this credit until one year after... Last reply: Marcus Sheffer, Aug 19, 2010, 4:41 pm |
|
Computer loadCS-2009 EAp2: Minimum Energy Performanceposted by Diana Wellenbrink on Aug 18, 2010, 11:11 pm
Should a computer be calculated as 400W or according to Energy star in our case 175 KWh/annual or around 80 W?: ref: http... Last reply: Christopher Schaffner, Aug 19, 2010, 8:05 am |
|
Outdoor TrackSchools-2009 SSc7.1: Heat island effect - nonroofposted by Linda Davisson on Aug 18, 2010, 12:14 pm
Our school project has an outdoor track made of rubber. Is this considered a hardscape or can it count as open space? Thanks Last reply: David Posada, Aug 18, 2010, 12:28 pm |
|
Pressure of water supply for faucets/showerheadsEBOM-2009 WEp1: Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Yong Lee Low on Jul 27, 2010, 4:10 am
Does the flow rate to be specified in the online template for all the kitchen/public and private lavatory faucets/showerheads to be at a specific PSI? For. eg. the showerhead used in the building... Last reply: Jenny Carney, Aug 18, 2010, 11:45 am |
|
Original Building ComplianceCI-2009 IEQc7.1: Thermal comfort - designposted by Jeremy Kuhre on Aug 12, 2010, 4:40 pm
I'm a little new to LEED CI (got my AP cred. in NC) and have had intermittent confusion on the scope of LEED CI certification. As I understand it, only work performed as part of the tenant fit-... Last reply: Jeremy Kuhre, Aug 18, 2010, 11:40 am |